Browse
Search
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:45:04 AM
Creation date
11/14/2024 11:47:23 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 11-19-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 87 <br /> Step 3— Finalizing the parameter weightage for each project type. <br /> In this step,the parameter weightage for each type of project was determined through a combination of survey <br /> results,available data,and relevance to the list of projects.The next set of charts show the relative weights of the <br /> parameters for each project type. <br /> 7% The new location and widening projects were evaluated <br /> Improve using the Travel Demand Model.This allowed for the <br /> Freight <br /> Movement comparison of base year and future year volumes. <br /> The list of projects in the TMP are primarily capital <br /> projects.Hence,the survey scores pertaining to <br /> `improve pavement condition'were eliminated and <br /> equally distributed amongst the other parameters. <br /> For new roadways,there were no base year volumes. <br /> In order to calculate the measures,the outputs for <br /> -5 O 43% build volumes and build V/C ratios were separately <br /> g Improve <br /> Congestionnormalized.These values were then used for the change <br /> Access and in volume and change in V/C scores and merged back <br /> Connectivity with the rest of the list. <br /> 44 Parameter Measure <br /> Figure 6.1: Score Composition for New Improve AccessChange in Volume/ <br /> Roadway/Widening projects and ConnectivityManage Change in Capacity <br /> Relative change in <br /> Congestion <br /> Volume to Capacity <br /> ratios (V/C) <br /> improve - Change in Truck <br /> Movement <br /> Volumes <br /> Table 6.2: Parameters for New Roadway/ <br /> Widening Projects <br /> PAGE 48 Orange County Transportation Multimodal Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.