Browse
Search
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:45:04 AM
Creation date
11/14/2024 11:47:23 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Minutes 09-26-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-01-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-08-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 10-15-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
Minutes 11-19-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-039-Fiscal Year 2024-25 Budget Amendment #3
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-040-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-041-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-097-Interlocal Agreement Renewal – Hollow Rock Nature Park
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-098-Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-026-Native American Heritage Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-064-Resolution of Commendation for Commissioner Anna Richards
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 67 <br /> Project Types <br /> Projects were categorized using the NCDOT CTP Transit and Rail <br /> standards.The following section provides definitions of Fixed Guideway:These include Commuter Rail Transit <br /> project classifications. and projects on a separate corridor. <br /> Roadway Regional Fixed Bus Corridor:These include bus routes <br /> Access Management/Operations:Access management that travel to different regions and counties. <br /> projects are those designed to improve capacity and <br /> safety of the roadway and may include intersection Rural Fixed Bus Corridor:These include bus routes that <br /> and safety improvements along a corridor.Operations serve rural areas. <br /> projects are those design to improvement management of Urban Fixed Bus Corridor:These include bus routes that <br /> the roadway systems and include safety and maintenance serve urban areas and municipalities. <br /> projects. <br /> Congestion/Mobility:Congestion projects are those <br /> designed to lessen traffic congestion and typically involve <br /> adding additional lanes to a roadway.Mobility projects <br /> are those designed to provide better connectivity and <br /> access and may include projects on new location. <br /> Modernization:Modernization projects include those I <br /> designed to update the roadway to NCDOT design <br /> standards.They may include improving the cross section <br /> to current standards by increasing travel lane widths, <br /> adding shoulders,improving sight distance,adding turn <br /> lanes,and accommodating multimodal needs. <br /> Other:These are projects that do not fit into one of the <br /> above categories.They include pavement rehabilitation, <br /> Intellitgent Transportation Systems strategies,signal <br /> and surveillance upgrades,wayfinding and messaging <br /> improvements,and economic development projects. `� -1 �-- <br /> Bicycle and Pedestrian -� • <br /> Bicycle:These projects include paved shoulders,shared _ <br /> markings,and dedicated bicycle lanes. — '► <br /> Pedestrian:These projects include sidewalks and I <br /> pedestrian paths. : <br /> Bicycle and Pedestrian:These projects are those that <br /> recommend both bicycle and pedestrian facilities along <br /> the same segment. <br /> Multiuse Path:These projects include physically <br /> separated paths for use by both cyclists and pedestrians. ' <br /> Trail:These projects are off-road trails,including paved <br /> and unpaved trails.They are part of larger trail networks ' <br /> and may follow creeks or other natural features. <br /> PAGE 28 Orange County Transportation Multimodal Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.