Browse
Search
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:46:56 AM
Creation date
11/14/2024 11:21:06 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 11-19-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A05892FB-E22F-4F9D-8892-114F73CBF1B7 <br /> 12 <br /> Orange County Responsibilities: <br /> • None. <br /> Completion Criteria: <br /> • Equipment ready for shipment to final destination. <br /> 1.6.4 Ship Acceptance (Milestone) <br /> • All equipment shipped to the field. <br /> 1 .7 INSTALL FIXED NETWORK EQUIPMENT <br /> Motorola Responsibilities: <br /> • Motorola will be responsible for the installation of all fixed equipment contained in the <br /> equipment list and outlined in the System Description based upon the agreed to floor plans, at the <br /> sites where the physical facility improvement is complete and the site is ready for installation. <br /> All equipment will be properly secured to the floor and installed in a neat and professional <br /> manner,employing a standard of workmanship consistent with its own R-56 installation <br /> standards and in compliance with applicable National Electrical Code(NEC), EIA,Federal <br /> Aviation Administration(FAA), and FCC standards and regulations/ <br /> • For installation of the fixed equipment at the various sites,Motorola will furnish all cables for <br /> power,audio,control,and radio transmission to connect the Motorola supplied equipment to the <br /> power panels or receptacles and the audio/control line connection point. <br /> • During field installation of the equipment,any required changes to the installation will be noted <br /> and assembled with the final `as-built' documentation of the system. <br /> Orange County Responsibilities: <br /> • Provide secure storage for the Motorola-provided equipment, at a location central to the sites. <br /> Motorola coordinates the receipt of the equipment with the Customer's designated contact,and <br /> inventory all equipment. <br /> • Provide access to the sites,as necessary. <br /> Completion Criteria: <br /> • Fixed Network Equipment installation completed and ready for optimization. <br /> 1.7.1 Fixed Network Equipment Installation Complete <br /> • All fixed network equipment installed and accepted by the Customer. <br /> 1.7.2 System Installation Acceptance (Milestone) <br /> • All equipment installations are completed and accepted by the Customer. <br /> Orange County,North Carolina July 19,2024 <br /> VHF Paging System Upgrades Use or disclosure of this proposal is subject <br /> to the restrictions on the cover page. <br /> © Motorola Solutions Confidential Restricted Statement Of Work 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.