Browse
Search
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 8-f - Procurement of Replacement Radio Infrastructure for Fire and EMS Paging and Approval of Budget Amendment #3-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:46:56 AM
Creation date
11/14/2024 11:21:06 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 11-19-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:A05892FB-E22F-4F9D-8892-114F73CBF1B7 <br /> 10 <br /> 1 .4 CONTRACT DESIGN REVIEW <br /> 1.4.1 Review Contract Design <br /> Motorola Responsibilities: <br /> • Meet with the Customer project team. <br /> • Review the operational requirements and the impact of those requirements on various equipment <br /> configurations. <br /> • Establish a defined baseline for the system design and identify any special product requirements <br /> and their impact on system implementation. <br /> • Review the system design and scope of work,and update the contract documents accordingly. <br /> • Discuss the proposed Cutover Plan and methods to document a detailed procedure. <br /> • Submit design documents to the Customer for approval. These documents form the basis of the <br /> system,which Motorola will manufacture,assemble, ship, and install. <br /> • Prepare equipment layout plans for shipment to the field. <br /> Orange County Responsibilities: <br /> • The Customer's key project team participants attend the meeting. <br /> • Make timely decisions,according to the implementation tasks. <br /> • Frequency Licensing and Interference: <br /> — As mandated by FCC,the Customer, as the licensee,has the ultimate responsibility for <br /> providing all required radio licensing or licensing modifications for the system prior to <br /> system shipment. This responsibility includes paying for FCC licensing and frequency <br /> coordination fees. <br /> — Provide the FCC"call sign"station identifier for each site prior to system shipment. <br /> Completion Criteria: <br /> • Complete Design Documentation,which may include updated system description,equipment list, <br /> system drawings, or other documents applicable to the project. <br /> • Incorporate any deviations from the proposed system into the contract documents accordingly. <br /> • The system design is"frozen"in preparation for subsequent project phases such as Order <br /> Processing and Manufacturing. <br /> • A Change Order is executed in accordance with all material changes resulting from the Design <br /> Review to the contract. <br /> 1.4.2 Design Approval (Milestone) <br /> • The Customer executes a Design Approval milestone document. <br /> 1 .5 ORDER PROCESSING <br /> 1.5.1 Process Equipment List <br /> Motorola Responsibilities: <br /> • Validate Equipment List by checking for valid model numbers,versions,compatible options to <br /> main equipment, and delivery data. <br /> • Enter order into Motorola's Customer Order Fulfillment(COF)system. <br /> Orange County,North Carolina July 19,2024 <br /> VHF Paging System Upgrades Use or disclosure of this proposal is subject <br /> to the restrictions on the cover page. <br /> © Motorola Solutions Confidential Restricted Statement Of Work 1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.