Browse
Search
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 11-19-2024 Business Meeting
>
Agenda - 11-19-2024; 6-a - Transportation Multimodal Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 11:45:04 AM
Creation date
11/14/2024 11:17:10 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for November 19, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 11-19-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 96 <br /> Average section safety scores were calculated for all Select road Calculate average <br /> roadway projects for the Safety parameter.Figure segments that safety score from <br /> are coincident the selected road <br /> 6.8 illustrates the workflow used to determine the with the project segments <br /> average section safety score.The severity scores of <br /> the selected road segments were averaged out to <br /> determine a section safety score. Figure 6.8:Average Section Safety Score Workflow <br /> If more than 50% of roadway <br /> Multimodal connection along roadway projects was Coefficient <br /> multimodall <br /> used as a metric for the Multimodal parameter.Table connection: <br /> 6.10 lists the coefficient based on the connection <br /> available.Current infrastructure and bicycle and • No bicycle or pedestrian connection <br /> pedestrian TMP projects were considered when A bicycle or pedestrian connection <br /> determining multimodal connection.If 50%of the <br /> roadway project was adjacent to a multimodal 2Bicycle and pedestrian connection <br /> connection it either received a score of 1 or 2;projects <br /> Table 6.10: Multimodal Connection Coefficients <br /> with less than 50%received a score of 0. <br /> Parcels that may become potential right-of-way were identified for all TMP project minus roadway modernization and <br /> improvement and bicycle and pedestrian bridge projects.The number of parcels impacted is a metric factored in the Cost <br /> parameter.Figure 6.9 illustrates the workflow used to determine the number of parcels impacted per project. <br /> •i _ Select parcels located Count the number of parcels <br /> _ within the buffer located within the buffer <br /> Figure 6.9: Parcels Impacted Workflow <br /> All TMP projects,apart from roadway intersections Select sections of <br /> and transit,were analyzed to assess whether they project that overlap <br /> would cross a floodplain and require construction of a floodplains Calculate <br /> bridge.The area of a potential bridge is a metric for the area of <br /> g p g bridge in <br /> Cost parameter.Figure 6.10 illustrates the workflow acres <br /> Project width or cross <br /> used to determine the area of a potential bridge.For section minimum <br /> roadway projects,the width of the bridge is designated right of way <br /> by the cross section minimum right-of-way;bicycle <br /> and pedestrian project width was determined by the <br /> project's width,as noted in the blue cell. Figure 6.10: Bridge Area Workflow <br /> Orange County Transportation Multimodal Plan PAGE 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.