Orange County NC Website
ORANGE COUNTY <br /> NORTH CAROLINA <br /> 48 <br /> Stakeholder Coordination <br /> A Core Technical Team(CTT)was identified consisting of provide technical guidance throughout the course of the <br /> representatives from key transportation agencies within plan development.Table 1.1 shows the participants from <br /> Orange County,including BGMPO,DCHC MPO,CPRC, each of the agencies mentioned above. <br /> NCDOT Division 7. The key purpose of the CTT was to <br /> Agency Representative � . <br /> Nish Trivedi Transportation Services Director <br /> Orange County Darlene Weaver Transportation Planning Manager <br /> Chad Reimakoski Division Traffic Engineer <br /> Nishant Shah Division 9 Corridor Development Engineer <br /> • Nicholas Morrison Regional Transportation Planner <br /> Doug Plachcinski Executive Director <br /> David Miller Transportation Planner <br /> BG • Wannetta Mallette MPO Administrator <br /> CPPC • Karyl Fuller RPO Director <br /> Table 1.1:Agencies and representatives constituting the CTT <br /> The CTT met 9 times from November 2023 to August 2024 Detailed meeting minutes and presentations from each <br /> to guide the project process.A short summary of each of meeting are included in the Appendix I. <br /> these meetings is provided in Table 1.2. <br /> 0 Topics discussed <br /> 1 Nov 14,2023 Project Kickoff,description,extents,schedule.Team introduction <br /> 2 Dec 11,2023 Previous plans and studies identified,data requests, mapping template <br /> 3 Jan 8,2024 Data collection,symbology template, project attributes review <br /> 4 Feb 12,2024 Remaining data, maps prepared for TMP,number of projects by mode <br /> 5 Mar 11,2024 Data from ongoing plans, Public Engagement (PE) preparation <br /> 6 Apr 8,2024 Completed consolidated maps for each mode, PE updates <br /> 7 May 13,2024 Policy Recommendations analysis, Prioritization question s to CTT, PE results <br /> 8 Jun 10,2024 Prioritization methodology <br /> 9 Aug 12,2024 Score calculations,preliminary results of prioritization <br /> Table 1.2:Topics discussed at CTT meetings <br /> Orange County Transportation Multimodal Plan PAGE 9 <br />