Browse
Search
11.18.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
11.18.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 6:11:10 PM
Creation date
11/7/2024 6:10:46 PM
Metadata
Fields
Template:
BOCC
Date
11/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 Range Plan. Discussion was held on the Bike PED map presented in the Transportation Multimodal Plan, <br /> 48 but nothing is finalized on the map/plan as Stantec will be working on the Bike PED Plan moving forward. <br /> 49 <br /> 50 Motion with corrections/changes made to the document:Art Menius <br /> 51 Second: Heidi Perry <br /> 52 Unanimously Approved <br /> 53 <br /> 54 b. Non-STIP—Quarterly Review <br /> 55 Nish T. presented the County's Non-State Transportation (Non-STIP) improvement projects. He has gone <br /> 56 through the entire of list of Non-STIP projects summarized the nonstop projects a little better with the <br /> 57 funding and the summary of in the abstract to give you a better understanding what the Non-STIP are, <br /> 58 these are just the main highlights that was continued from the previous cycle. The list is up to date and <br /> 59 Nish will continue to update based on the discussion of crosswalks and bridges during this meeting. <br /> 60 <br /> 61 AGENDA ITEM 6. STAFF REPORT/UPDATES <br /> 62 a. MPO, RPO,and NCDOT <br /> 63 Nish provided updates—I40 widening has had some pushbacks and should be completed 2026.All the <br /> 64 projects that were submitted in SPOT 7 that got scored that are in division stuff right now is going <br /> 65 through express design—this includes widening of Hwy 70. Speed reduction on Hwy 70 has become a <br /> 66 higher priority because of the recent news last month of the kid that got killed on US 70.This is <br /> 67 something we will be working closely with NCDOT on to address safety moving forward. <br /> 68 <br /> 69 <br /> 70 AGENDA ITEM 8:ADJOURNMENT <br /> 71 OUTBoard meeting was adjourned at 7:59pm.The next meeting is scheduled for November 18th, 2024. <br />
The URL can be used to link to this page
Your browser does not support the video tag.