Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> 1-0305B Interchange improvements at 1-85 and SR 1009(South 10/15/2030 FY2033 $16,900,000 PE funding approved 9/8/17, Planning and Colin Mellor <br /> 34142.1.5 Churton Street)in Hillsborough Design activities underway, Coordinate <br /> 34142.3.3 with 1-0305 and U-5845. (1-0305B was <br /> 34142.3.4 formerly 1-5967) <br /> 34142.2.4 <br /> R-5821A Construct operational improvements including 6/17/2031 FY2033 $7,000,000 PE funding approved 10/10/17,design Suzana Matta <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, <br /> 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville Coordinating with NC54 West Corridor <br /> 47093.3.2 Road). Study <br /> 1-0305(A) Widening of 1-85 from west of SR1006(Orange Grove Road) 1/20/2032 FY2036 $132,000,000 PE funding approved 6/5/18, Planning and Colin Mellor <br /> 34142.1.2 in Orange Co.to west of SR 1400(Sparger Road)in Orange design activities underway, Project <br /> 34142.2.2 Co. reinstated per 2020-2029 STIP(funded <br /> 34142.3.2 project)and delete project 1-5983 <br /> 1-0305C Interchange improvements at 1-85 and NC 86 in 11/16/2032 FY2035 $20,900,000 PE funding approved 10/10/17, Planning Colin Mellor <br /> 34142.1.6 Hillsborough and Design activities underway, 1-0305C <br /> was formerly 1-5984. <br /> EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro TBD TBD $372,000 Review comments provided to Carrboro in Town of <br /> June 2023 for revisions and resubmittal. Carrboro/Stephen <br /> Resubmittal under review. Robinson <br /> SS-6207AF SR 1004(Efland-Cedar Grove Road)at SR 1306(Lebanon TBD TBD $25,000 Planning and design activities underway Dawn McPherson <br /> 51427 Road),west of Hillsborough.Convert intersection to all way <br /> stop traffic control(without flasher). <br /> Page 4 DCHCMPO Oct 2024 <br />