Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One(21)Routes.Curve Warning Sign 9/20/2023 9/30/24 $200,000 Planning and design activities underway. Dawn McPherson <br /> 51112 Installation. Construction started. <br /> SS-6207A NC 54 Pedestrian improvements between SR 1902(Manning 2/15/2024 10/31/2024 $171,000 Planning and design activities underway. Dawn McPherson <br /> 50337 Drive)and SR 1937(Old Fayetteville Road)in Chapel Hill Materials have arrived and work has <br /> and Carrboro. Improvements will include refuge islands, begun. <br /> crosswalks and pedestrian signals. Improvements to be <br /> completed by state forces. <br /> U-4726DF Bicycle detection at signalized intersections in Carrboro 8/15/2024 Spring 2025 $36,000 Plans at 90%completion-Plan review Town of <br /> comments returned back to the Town of Carrboro/Stephen <br /> Carrboro for revisions. Re-Let(Low bid Robinson <br /> concurrence package under review) <br /> C-5181 Jones Creek Greenway Project-Fill Gap between the 11/21/2024 FY2026 $654,000 Environmental document approved Town of <br /> Carrboro Upper Bolin Trail and Twin Creeks Greenway and 8/14/23. NCDOT to review plans once Carrboro/Stephen <br /> also implement program to support on-vehicle trips to Morris Carrboro develops and submits. Robinson <br /> Grove Elementary School <br /> HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Suzana Matts <br /> Beacons(RRFB), raised center island,pedestrian signage, <br /> and approximately 125 linear feet of sidewalk on NC 86 at <br /> Critz Drive in Chapel Hill <br /> HL-0045 Repair Bridge#241 on Exchange Park Lane over Eno River 1/16/2025 FY2027 $153,800 Agreement executed, Hillsborough to Town of <br /> from South Churton Street to Faribult Lane in Hillsborough prepare environmental documents and Hillsborough/Stephen <br /> plans. Review of final plans underway. Robinson <br /> BL-0044 NC 54 from Westbrook Drive in Carrboro to west of US 1/16/2025 7/31/2025 $1,311,000 Construction funding to be requested once Trung Nguyen <br /> 49998.1.1 15/501/NC 86(South Columbia Street)interchange in municipal agreements are executed. <br /> Chapel Hill. Construct sidewalk and install pedestrian Chapel Hill MA executed,Carrboro MA <br /> signals,crosswalks,and refuge islands at selected locations. has also been executed. Utility <br /> Relocations Underway. <br /> P-5701 B Construct Platform, Passenger Rail Station Building at 6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough and deisgn activities underway <br /> 46395.3.3 <br /> BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander Foster <br /> Page 1 DCHCMPO Oct 2024 <br />