Orange County NC Website
NCDOT PROJECTS LOCATED/N BGMPO- UNDER DEVELOPMENT <br /> Let/Start Completion <br /> TIP/WBS# Description Date Date Cost Status Project Lead <br /> U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada 3/16/27 FY2030 $21,000,000 Planning and design activities Brandon Green <br /> 50234.1.1 Road)to US 70(South Church Street)in Burlington underway-Field Inspection held. <br /> 50234.2.1 ROW acquisitions 75%complete. <br /> 50234.3.1 <br /> BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 10/7/27 FY2029 $1,200,000 Planning and design activities Daniel Dagenhart <br /> underway-Plans at 65 <br /> B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19. David Stutts <br /> 48709.1.1 SR 1928(Trollingwood Road)in Haw River Planning and design activities <br /> 48709.2.1 underway. <br /> 48709.3.1 <br /> U-6013 Widen NC 119 to multi-lanes from SR 1981(Trollingwood- 5/16/28 FY2031 $6,200,000 Planning and design activities Suzana Matta <br /> 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway,ROW certified and <br /> 47158.2.4 (non-system)in Mebane. utilities underay. <br /> 47158.3.4 <br /> U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 10/16/29 FY2031 $900,000 Planning and design activities Brandon Green <br /> Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending.(Funded for Prelim. <br /> in Burlington Engineering only) <br /> U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $6,337,000 Planning and design activities Suzana Matta <br /> 47144.1.1 St)from Tarleton Ave.to Fifth Street in Burlington underway <br /> 47144.2.1 <br /> 47144.3.1 <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 6/20/30 FY2032 $936,000 Planning and design activities Brandon Green <br /> 47962.1.1 (Huffman Mill Road). Construct additional right turn lane on I- pending.(Funded for Prelim. <br /> 47962.2.1 40 WB Ramp and improve operations at SR 1308(Garden Engineering only) <br /> 47962.3.1 Road)intersection in Burlington <br /> BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 9/18/31 FY2033 $700,000 Planning and design activities Daniel Dagenhart <br /> underway <br /> BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 10/7/32 FY2034 $700,000 Planning and design activities Daniel Dagenhart <br /> pending <br /> BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/21/32 FY2034 $700,000 Daniel Dagenhart <br /> SM-6107D E.M.Holt Elementary School located at 4751 NC 62, TBD TBD $750,000 Planning and design activities Brian Thomas <br /> 51319 Burlington,NC,south of Burlington.Internal campus underway.Work performed by <br /> improvements as identified in Traffic Operations Study SCH-F- school system with reimbursement <br /> 2019-074 to contain school-related traffic queues on campus. by department.Work complete. <br /> Waitinq on start and completion <br /> Page 2 BGMPO Oct 2024 <br />