Browse
Search
Agenda - 11-12-2024; 2 - Discussion on Affordable Housing Bond-Capital Investment Plan (CIP) Scoring Matrix
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 11-12-2024 Work Session
>
Agenda - 11-12-2024; 2 - Discussion on Affordable Housing Bond-Capital Investment Plan (CIP) Scoring Matrix
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2024 3:13:48 PM
Creation date
11/7/2024 3:15:39 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2024
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
2
Document Relationships
Agenda for November 12, 2024 Work Session
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-12-2024 Work Session
Minutes 11-12-2024 - Work Session
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 4. Building and Site Design (20 points) <br /> Assign a number of points in the green boxes below according to your best judgment. You may provide a narrative explanation for each. <br /> Narrative <br /> Project incorporates sustainable design elements, <br /> such as smaller building sizes, use of local/recycled <br /> building materials, energy efficient features,' <br /> LED lighting,water conservation fixtures, efficient <br /> HVAC systems, etc. (up to 5 points) <br /> OProject provides handicap accessibilty and/or <br /> incorporates Universal Design (up to 5 points) <br /> Project incorporates sustainable community and <br /> environmental design elements, such as flexible <br /> lot design, low impact development, storm water <br /> controls, reduced impervious surface areas, <br /> natural or drought-resistant landscaping, or any <br /> other additional element that would serve to <br /> minimize negative environmental impacts, as <br /> Orange County regulations allow (up to 5 points) <br /> Project is connected to water and sewer service, <br /> will connect to existing service, or will use a <br /> community well and sewer system consistent <br /> with water and sewer boundary agreements <br /> and local standards (up to 5 points) <br /> TOTAL POINTS <br /> Project meets/excceds NCHFA energy criteria: https://www.nchfa.com/sites/default/files/page attachmentslQAP20FinalAppendixB.pdf <br /> 2See: https://www.wbdg.org/design-objectives/accessible/beyond-accessibility-universal-design <br />
The URL can be used to link to this page
Your browser does not support the video tag.