Orange County NC Website
68 <br /> Orange County,NC August 8,2024 <br /> ASTRO®25 Advanced Services Statement of Work <br /> FACILITIES CHECKLIST—LEVEL I <br /> Visual inspection Check for damage, corrosion, physical connections, dirt and dust, and error indications. <br /> (condition, cabling) 1� Generator <br /> T <br /> Visual Inspection Check panel housing for cracks, rust, and weathering. Check physical connections for <br /> corrosion, dirt and dust, or other abnormal conditions. <br /> Fuel Verify fuel levels in backup generators, document date of last fuel delivered from fuel <br /> service provider. <br /> Oil Check the oil dipstick for the proper level. Note the condition of oil. <br /> Verify operation Verify generator running and check ease or difficulty of start. Is the generator"throttling" <br /> (no switchover) or running smooth?Any loud unusual noise? Document any concerns or abnormal <br /> conditions. <br /> Motorized Check operation <br /> Dampers <br /> Air Filter Check air filter and recommend replacement if required. <br /> Coils Check coils for dirt and straightness. <br /> Outdoor Unit Check that the outdoor unit is unobstructed. <br /> Wiring Check wiring for insect and rodent damage. <br /> Cooling/ Heating Check each HVAC unit for cooling/heating. <br /> Motorized Check operation. <br /> Dampers <br /> Section 5 <br /> Priority Level Definitions and <br /> Response Times <br /> Table 5-1: Priority Level Definitions and Response Time describes the criteria Motorola uses to <br /> prioritize incidents and service requests, and lists the response times for those priority levels. <br /> MOTOROLA SOLUTIONS <br /> Priority Level Definitions and Response Times <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 57 <br />