Orange County NC Website
59 <br /> Orange County,NC August 8,2024 <br /> ASTRO®25 Advanced Services Statement of Work <br /> Table 4-17: Limited Priority Level Definitions and Response Times <br /> IncidentResponse <br /> Critical P1 Core: Core server or core link failure. No redundant Response provided during <br /> server or link available. normal business hours until <br /> Sites/Subsites: Primary site down. Two RF sites or service restoration. <br /> more than 10% of RF sites down, whichever is Field service technician arrival <br /> greater. on-site within 4 hours of <br /> Consoles: More than 40% of a site's console receiving dispatch notification. <br /> positions down. <br /> Conventional Channels: Conventional Channel <br /> Gateways (CCGW) down without redundant <br /> gateways available. <br /> Security Features: Security is non-functional or <br /> degraded. <br /> High P2 Core: Core server or link failures. Redundant server Response provided during <br /> or link available. normal business hours until <br /> Consoles: Between 20% and 40% of a site's service restoration. <br /> console positions down. Field service technician arrival <br /> Sites/Subsites: One RF site or up to 10% of RF on-site within 4 hours of <br /> sites down, whichever is greater. receiving dispatch <br /> Conventional Channels: Up to 50% of CCGWs notification. <br /> down. Redundant gateways available. <br /> Network Elements: Site router, site switch, or GPS <br /> server down. No redundant networking element <br /> available. <br /> Medium P3 Consoles: Up to 20% of a site's console positions Response provided during <br /> down. normal business hours until <br /> Conventional Channels: Single channel down. service restoration. <br /> Redundant gateway available. Field service technician arrival <br /> Network Elements: Site router/switch or GPS on-site within 8 hours of <br /> server down. Redundant networking element receiving dispatch <br /> available. notification. <br /> Low P4 Service Requests: Minor events and warnings in Not applicable. <br /> the system. Preventative and planned maintenance <br /> activities (scheduled work). <br /> 4.1.9 Annual Preventative Maintenance <br /> Motorola personnel will perform a series of maintenance tasks to keep network equipment functioning <br /> correctly. <br /> 4.1.9.1 Description of Service <br /> Annual Preventative Maintenance provides annual operational tests on the Customer's infrastructure <br /> equipment to monitor its conformance to specifications. <br /> MOTOROLA SOLUTIONS <br /> Advanced Services Detailed Description <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 48 <br />