Orange County NC Website
36 <br /> Orange County,NC August 8,2024 <br /> ASTRO®25 Advanced Services Statement of Work <br /> Motorola Responsibilities <br /> Motorola will fulfill the following responsibilities to provide the ASTRO 25 Connectivity Service. <br /> • Perform a site survey prior to installation to assess that all the conditions for a proper site <br /> installation can be met, including, but not limited to the presence of network facilities necessary <br /> to provide the necessary connectivity. <br /> • Motorola will note any variations of the site that would affect the hardware specifications or <br /> estimated labor involved for a standard installation. If the site survey indicates a non-standard <br /> installation (for example, the need for construction of"last mile" network facilities), then a <br /> mutually agreed change order may be required. <br /> • It is assumed that in the building, LTE coverage is adequate at the installation site. If, during <br /> installation, it is determined the in-building LTE coverage is not adequate for service, then a <br /> mutually agreed change order may be required for external antenna installation. <br /> • Standard Demarc— Motorola will install cable between the Local Exchange Carrier Minimum <br /> Point of Entry (MPOE) and the Managed Elements located within the customer ASTRO <br /> infrastructure. Motorola will install the demarc standard —which includes one service call, up to <br /> two (2) total hours of on-site labor, and installation of one (1) cat 3, 5, or 5e cable drop up to 150 <br /> feet (vertical length up to 12 feet), connectors, ty-wraps,jacks, face plates, and cable. A <br /> mutually agreed change order may be required if the site survey indicates a non-standard <br /> extended demarc (for example, the need for cable through walls over 150' or multiple floors). <br /> • Install equipment supplied by Motorola. Installation period is estimated to be within 45 business <br /> days from when Motorola and Customer execute the Agreement and related addendum or <br /> addenda. <br /> • Cooperate with the Customer to schedule the ASTRO 25 Connectivity Service implementation. <br /> • Administer safe work procedures for installation of the remote access circuit. <br /> Customer Responsibilities <br /> • Sign the Transport Connectivity Addendum (TCA). <br /> • Provide space for the networking equipment at the core site. <br /> • Ensure communications sites meet space, grounding, power, and connectivity requirements for <br /> equipment installation. <br /> • Obtain all licensing, site access, or permitting required for project implementation. <br /> • Provide a dedicated delivery point (such as a warehouse), for receipt, inventory, and storage of <br /> equipment prior to delivery to the site(s), if requested by Motorola. <br /> • Ensure existing sites or equipment locations have sufficient space available for the system, as <br /> specified by Motorola's R56 Standards and Guidelines for Communication. <br /> • Ensure that existing sites or equipment locations have adequate electrical power in the proper <br /> phase, in the proper voltage, and with necessary site grounding to support the requirements of <br /> the equipment provided with the ASTRO 25 Connectivity Service. <br /> • Perform any location upgrades or modifications. <br /> • Obtain and maintain approved local, State, or Federal permits necessary for installing and <br /> operating the proposed equipment. <br /> • Provide any required system interconnections not specifically included in the ASTRO 25 <br /> Connectivity Service. <br /> ®MOTOROLASOLUTIONS <br /> Advanced Services Detailed Description <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 25 <br />