Browse
Search
Agenda - 11-07-2024; 6-b - Safe Routes to School Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 11-07-2024 Business Meeting
>
Agenda - 11-07-2024; 6-b - Safe Routes to School Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 2:05:23 PM
Creation date
10/31/2024 1:56:49 PM
Metadata
Fields
Template:
BOCC
Date
11/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for November 7, 2024 BOCC Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 11-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
98 <br /> 7 - Orange Middle School <br /> The following set of recommendations have been developed for Orange Middle. Figure 4.7 shows <br /> the recommended projects. <br /> Project ID Recommendation Issue Addressed Need MTP Reference <br /> 7a Construct 0.2 miles of There are no on campus High <br /> sidewalk or shared-use path sidewalks connecting to <br /> connecting from Orange the school entrance. <br /> Middle School building <br /> along the driveway to the <br /> short section of existing <br /> sidewalk along Orange High <br /> School Road. <br /> 7b Construct 0.7 miles of The lack of bicycle and High DCHC MPO <br /> sidewalk or shared-use path pedestrian infrastructure 2017 CTP; <br /> along Orange High School along Orange High Hillsborough <br /> Road from Harold Latta School Road present key CSP 2030 <br /> Drive to US 70. infrastructure gaps for <br /> cyclists and pedestrians. <br /> 7c Construct 2.1 miles of 4' The lack of bicycle and High DCHC MPO <br /> paved shoulders and a pedestrian infrastructure 2017 CTP; <br /> sidewalk or a shared- along US 70 present key Hillsborough <br /> use path along US 70 infrastructure gaps for CSP 2030 <br /> from Combs Circle to N cyclists and pedestrians. <br /> Scotswood Boulevard. <br /> 7d Construct 0.2 miles of The lack of bicycle and High DCHC MPO <br /> sidewalk or shared-use path pedestrian infrastructure 2017 CTP; <br /> along Harold Latta Drive along Harold Latta Road, Hillsborough <br /> from Orange High School present key infrastructure CSP 2030 <br /> Road to Cloverfield Drive. gaps for cyclists and <br /> pedestrians. <br /> 7e Construct 0.5 miles of The lack of bicycle and High <br /> sidewalk or a shared-use pedestrian infrastructure <br /> path along Orange High along Orange High <br /> School Road from Harold School Road present key <br /> Latta Road to Miller Road to infrastructure gaps for <br /> fill in infrastructure gaps. cyclists and pedestrians. <br /> 7f Construct 0.1 miles of The lack of bicycle and High <br /> sidewalk or a shared-use pedestrian infrastructure <br /> path along Ann Road to fill along Ann Road present <br /> in infrastructure gaps. key infrastructure gaps for <br /> cyclists and pedestrians. <br /> There is a crosswalk at <br /> Orange High School Road <br /> and Ann Road with no <br /> connecting sidewalks. <br /> Safe Routes to School <br /> Orange County,North Carolina 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.