Browse
Search
Agenda - 11-07-2024; 6-b - Safe Routes to School Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 11-07-2024 Business Meeting
>
Agenda - 11-07-2024; 6-b - Safe Routes to School Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 2:05:23 PM
Creation date
10/31/2024 1:56:49 PM
Metadata
Fields
Template:
BOCC
Date
11/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for November 7, 2024 BOCC Meeting
(Attachment)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 11-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
113 <br /> 12f Construct 0.5 miles of The lack of bicycle and High <br /> sidewalk or shared-use pedestrian infrastructure <br /> path along St Marys Road along St Marys Road presents <br /> from Cameron Street a key infrastructure gap for <br /> to east of River Park cyclists and pedestrians. <br /> Elementary. <br /> 12g Construct 1.1 miles of a The lack of bicycle and High <br /> buffered bicycle lane or pedestrian infrastructure <br /> shared-use path along along St Marys Road presents <br /> St Marys Road from a key infrastructure gap for <br /> Cameron Street to US 70. cyclists and pedestrians. <br /> 12h Construct 0.2 miles of The lack of bicycle and High <br /> sidewalk or shared-use pedestrian infrastructure <br /> path along Lydia Lane along Lydia Lane presents <br /> from Caine Street to St a key infrastructure gap for <br /> Marys Road. cyclists and pedestrians. <br /> 12i Construct 0.3 miles of The lack of bicycle and High <br /> sidewalk or shared-use pedestrian infrastructure <br /> path along E Queen along E Queen Street <br /> Street from N Churton presents a key infrastructure <br /> Street to Lydia Lane. gap for cyclists and <br /> pedestrians. <br /> 12j Construct 0.2 miles of The lack of bicycle and High <br /> sidewalk or shared-use pedestrian infrastructure <br /> path along N Cameron along Cameron Street <br /> Street from E Queen presents a key infrastructure <br /> Street to E King Street. gap for cyclists and <br /> pedestrians. <br /> 12k Construct 0.2 miles of The areas to the east, High <br /> greenway from Cameron south, and west of River <br /> Street to the east through Park Elementary are <br /> undeveloped land to the underdeveloped and <br /> southern side of River underutilized for bicycle and <br /> Park Elementary. pedestrian infrastructure. <br /> 121 Implement traffic There are multiple roadways Medium <br /> calming measures,such in the area that pose safety <br /> as speed humps along barriers for elementary student <br /> Queen Street. pedestrians and bicyclists. <br /> 12m Implement traffic There are multiple roadways Medium <br /> calming measures,such in the area that pose safety <br /> as speed humps along barriers for elementary <br /> Cameron Street. student pedestrians and <br /> bicyclists. <br /> 12n Implement traffic There are multiple roadways Medium <br /> calming measures,such in the area that pose safety <br /> as raising the existing barriers for elementary <br /> crosswalk on St Marys student pedestrians and <br /> Road. bicyclists. <br /> Safe Routes to School <br /> Orange County,North Carolina 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.