Orange County NC Website
21 <br /> 1 Slide #9 <br /> ENROLLMENT AND CAPACITY <br /> • County is still committed ensuring both districts have <br /> adequate capacity at all levels. <br /> • May not have debt capacity to fund additional major <br /> project on top of the current Bond, so districts should <br /> propose options that redirect funding first. <br /> • Ultimate decision on redirecting funding or approving <br /> additional funding lies with future Boards. <br /> • Currently enrollment is declining for both districts, so <br /> unlikely to be necessary. <br /> — Most likely capacity need would be at the High School level at <br /> CHCCS,requiring a wing addition at Carrboro HS. <br /> ORANGECOUNTY <br /> NORTH CAROLINA <br /> 2 <br /> 3 <br /> 4 Slide #10 <br /> CAPITAL FUNDING POLICY <br /> • Questions, feedback? <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> 5 <br /> 6 Chair Bedford referred to attachment D in the agenda packet. She said she thought it was <br /> 7 still valuable because of some of the standards and processes that were included. <br /> 8 Chair Bedford said there are parts of attachment D that she thinks should be used for <br /> 9 regulations. She said it talks about environmental factors, having the project approval, and how <br /> 10 they should look to the towns for a larger gym. <br /> 11 Commissioner Hamilton said that attachment D is a policy on planning and funding. She <br /> 12 said that currently the Board is discussing funding. She said that having a policy on planning <br /> 13 could lay out some of the procedural issues. She said she noted some things on it that they should <br /> 14 keep and maintain. <br /> 15 Chair Bedford said staff could determine how to bring that back to the Board. <br /> 16 Kirk Vaughn said if there is anything in this document that they would find to be valuable <br /> 17 for the funding policy, they can add that. <br /> 18 Commissioner Richards asked if they would have an update when it is brought back. <br />