Orange County NC Website
15 <br /> Slide #23 <br /> Changing plans? <br /> The current MPD-CZ allows no major changes. <br /> Thus a new plan is needed: <br /> - a smaller village <br /> - individually-owned homes and/or lots(under HOA or Condominium <br /> Association) <br /> - community-installed infrastructure with more homebuilder flexibility <br /> (re.timetable and design... within community guidelines) <br /> - strongest possible protections for the remainder of the land as <br /> farmland and community-accessible open space <br /> Slide #24 <br /> The UDO's (2017) Flexible Subdivision- Conservation Cluster <br /> framework readily provides for all of this. The upshot: <br /> - We are designing a new village layout and site plan per the <br /> Flexible Subdivision- Conservation Cluster provisions (section <br /> 7.12) <br /> - This is a form of Minor Subdivision, so the new plan will need <br /> only administrative approval <br /> - BUT since the Minor Subdivision is an overlay on R-1 <br /> conventional zoning, we need first to revert from our current <br /> MPD-CZ to R-1, and this is a BOCC matter. This is our present <br /> request. <br />