Browse
Search
10.21.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
10.21.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 8:33:23 PM
Creation date
10/15/2024 8:30:33 PM
Metadata
Fields
Template:
BOCC
Date
10/21/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Non-STIP Projects 10/7/2024 <br /> Segments and Other <br /> # Segment Improvement Update <br /> Staff pursuing multiple avenues for improvement including <br /> Orange Grove Road from Efland Pond to New Grady 2024 Safe Routes to School Upate, WSP Design & Engineering, <br /> 1 Brown school Road SPOT 7 Division funding, SPOT Safety/Mobility/HSIP and HMIP. <br /> Bowman Rd between Ben Wilson Road and W. Ten Staff will analyse as part of the potential update to the 2019 <br /> 2 Rd EBM AMP, taking into consideration new SRTP and SRTS <br /> 3 Eno Mountain Road/Mayo Street Added as County Priority, anticipate submission for SPOT 7 <br /> 4 Efland-Cedar Grove Road improvements Complete, implemented through HI/LC. Completed 2023 <br /> # Other Update <br /> Synchronize traffic signals on NC-86 (MLK)from <br /> 1 Duke Forest and Weaver Dairy Road Chapel Hill pursuing through SPOT 7 <br /> Resurface Rocky Ridge Road from Dairyland Road to <br /> 2 Arthur Minnis Road with extra shoulder Review HMIP and coordinate with NCDOT for update. <br /> Part of rural buffer, County priority is modernize Old NC-86, <br /> Carrboro priority is bike lane per their locally adopted plan, <br /> 3 Bike lane old NC-86- Farm House Rd to Dairyland Rd town would have to maintain bike lane. <br /> Grading improvement-Jones Ferry Rd from Old scheduled for replacement 2029. HMIP resurfacing is <br /> 4 Fayetteville Rd to county line scheduled for 2025. <br /> 5 NCDOT Bike Passing signs Coordinate with NCDOT when funding becomes available. <br /> Orange Grove Rd north of Dairyland Rd <br /> Bradshaw Quarry Rd west of Orange Grove Rd <br /> Old Greensboro Rd west of Jones Ferry Rd <br /> Jones Ferry Rd west of Old Greensboro Rd <br /> Mebane Oaks Rd north of Bradshaw Quarry Rd <br /> Old Greensboro Rd east of Haw River <br /> Borland Rd north of Arthur Minnis Rd <br /> Union Grove Church Rd south of Arthur Minnis Rd <br /> Complete -NCDOT policy on NC/US routes when resurfacing <br /> 6 Center lane reflectors roads. SR routes and other roads on a case-by-case bases. <br /> Northwood Subdivision <br /> 1.The roads have a couple re-occuring potholes that <br /> are patched yearly. <br /> 2. Culverts and ditches are largely failing causing <br /> standing water. <br /> 3. Edges of the roads are being eroded due to <br /> 7 vegetation/pine needles and water flow. JAII roads are scheduled for resurfacing 2024 <br /> 8 Orange Grove Road Maintenance I Resurfacing complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.