Browse
Search
Agenda - 10-15-2024; 5-a - Short Range Transit Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 10-15-2024 Business Meeting
>
Agenda - 10-15-2024; 5-a - Short Range Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 1:32:50 PM
Creation date
10/10/2024 1:34:02 PM
Metadata
Fields
Template:
BOCC
Date
10/15/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for October 15, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 10-15-2024 Business Meeting
OTHER-2024-085-Short Range Transit Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-089-Bonnie B. Davis Meeting Room Audio Visual System Upgrade
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-090-Approval and Adoption of 2025 Reappraisal Schedule of Values
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-021-Proclamation Recognizing 25 Years of Orange County Conservation Initiatives Great Trails State Day
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-022- Proclamation Designating October 2024 as Arts and Humanities Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-023-Cybersecurity Awareness Month 2024
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-024-Proclamation Recognizing and Honoring Dr. Harold Russell
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix D: Public Engagement OR <br /> 4NRG ETRANSIT PLAN <br /> OUN Y <br /> TACTICSAND TOOLS encouraged to fill out the survey either online or on paper and <br /> submit their feedback prior to the end of the engagement period <br /> The following activities were conducted to engage and collect on September 12, 2024. All information was made available in <br /> feedback from residents and stakeholders during Phase 2 of the English, Spanish, and Mandarin. A list of pop-up events, their <br /> public engagement period. dates, times, and locations are available in Appendix A. <br /> Pop-Up Events Presentations <br /> The project team held a series of seven pop-up events at The project team conducted presentations with the Orange <br /> community centers, senior centers, shopping locations, and local Unified Transportation Board (OUTBoard) and the Mebane Bicycle <br /> events between August 20, 2024, and September 10, 2024. These and Pedestrian Commission (BPAC). The presentations consisted <br /> events provided transit riders and residents an opportunity to of project updates on the proposed changes in the plan, and <br /> provide feedback on the proposed changes and learn about opportunities for attendees to provide feedback were provided. <br /> existing and future transit services. Pop-ups were conducted at <br /> various times of the day at the following locations, chosen based Survey <br /> on Phase 1 engagement experience and stakeholder input: <br /> The project team administered a brief survey seeking feedback on <br /> ■ Passmore Center the proposed changes to transportation services. The survey was <br /> ■ Seymour Center distributed both online and in print in English, Spanish, and <br /> ■ Hillsborough Walmart Mandarin. The survey was open from August 19, 2024, to <br /> ■ Efland Cheeks Community Center Food Distribution September 13, 2024. Analysis of the survey results can be found in <br /> ■ Eno Arts Mill First Fridays <br /> Appendix D. <br /> ■ Mebane Farmer's Market ADVERTISING METHODS <br /> ■ Cedar Grove Community Center <br /> At each event, the project team had an informational board that <br /> showed the proposed changes to transit services on a map and Project Website <br /> provided explanations about each of the services.Additionally, The project website developed for Phase 1 of the public <br /> the project team had paper flyers that had the informational engagement process was updated to include the proposed <br /> board on one side and a survey on the other. People were transportation service changes and plan overviews, Phase 2 <br /> Nelson\Nygaard Consulting Associates 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.