Browse
Search
Agenda - 10-15-2024; 8-e - Bid Award – Fairview Park Tennis-Pickleball Court Expansion Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 10-15-2024 Business Meeting
>
Agenda - 10-15-2024; 8-e - Bid Award – Fairview Park Tennis-Pickleball Court Expansion Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 1:29:56 PM
Creation date
10/10/2024 11:44:28 AM
Metadata
Fields
Template:
BOCC
Date
10/15/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for October 15, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 10-15-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 3,2024 <br /> Fairview Park Tennis <br /> Hillsborough,North Carolina <br /> Sourcewell Master Project:#199030,Contract Number:071623-MSL, Expiration: 06/16/2027 <br /> All purchase orders should note the following: Sourcewell purchase—contract number: 041123-MSL <br /> Sourcewell Pricing Tennis 3 side by side 50 footcandles......................................................................................$225,000 Corrected <br /> Light-Structure SystemTA9 with Total Light Control—TLC for LED®technology <br /> Guaranteed Lighting Performance <br /> • Guaranteed light levels of 50 foot-candles <br /> System Description <br /> • Factory wired and tested remote electrical component enclosures <br /> • Pole length,factory assembled wire harnesses <br /> • Factory wired pole top luminaire assemblies <br /> • Factory aimed and assembled luminaires <br /> • UL Listed assemblies <br /> Operation and Warranty Services <br /> • Product assurance and warranty program that covers materials and onsite labor,eliminating 100%of your maintenance <br /> costs for 25 years <br /> • Support from Musco's Lighting Services Team—over 170 Team members dedicated to operating and maintaining your <br /> lighting system—plus a network of 1800+contractors <br /> Sourcewell Master Project: 199030,Contract Number:041123-MSL, Expiration:06/16/2027 Category:Sports lighting with related <br /> supplies and services. All purchase orders should note the following: Sourcewell purchase—contract number:041123-MSL <br /> Notes <br /> Quote is based on: <br /> • Owner is responsible for getting electrical power to the site,coordination with the utility,and any power company fees. <br /> • Care will be taken on the perimeter of the fields, but the owner is responsible for landscape repair if needed. <br /> • Musco's North Carolina General Contractors license#76348, Electrical License#11174-U <br /> • Assumes standard soil conditions.Rock,bottomless,wet or unsuitable soil may require additional engineering,special installation methods <br /> and additional cost. <br /> • Applicable USE tax,signed and sealed electrical drawings, permitting,and installation are included. <br /> • Courtside push button control is included <br /> • Pricing valid for 90 days <br /> Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details. <br /> Dina Neeley <br /> Senior North Carolina Lighting Consultant <br /> @muscolightlady <br /> 336.414.1030 <br /> dina.neeley@musco.com <br /> muscvn <br /> -1- M-2168-enUS-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.