Orange County NC Website
32 <br /> 1 Slide#3 <br /> SELECTION OF CPL & PROPOSAL <br /> • In 2022 CPL was selected to provide preliminary/advanced planning <br /> services for the future Crisis Diversion Facility. <br /> • Final recommendation included a 27,000 sq. ft. facility with 18 <br /> patient care bays. <br /> • RFQ was issued in July 2024 and CPL was the only firm to respond. <br /> • Their proposal was selected based on their strong performance <br /> during the preplanning phase and their knowledge of the project. <br /> — Task I: Site Selection and Evaluation. $143,890 <br /> — Task II: Construction Documentation thru Construction- <br /> $1,575,760 <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> 2 <br /> 3 <br /> 4 Slide #4 <br /> N EXT STEPS <br /> Next Steps: <br /> • Fall/Early Winter2024 <br /> Site Evaluation and Purchase <br /> Design Development by CPL <br /> Board Approval of Construction Manager At Risk Process <br /> RFQ for Construction Manager at Risk <br /> • Winter/Spring 2025 <br /> Construction Documents Preparation by CPL <br /> Bid of steel and electrical components (Requires Board Approval) <br /> Submission to Health Service Regulation ("NCDHSR") <br /> • Summer 2025 <br /> Biding <br /> Construction <br /> • Winter2026 � <br /> Grand Opening ORANGE COUNTY <br /> NORTH CAROLINA <br /> 5 <br /> 6 Commissioner Richards asked if there is more than one site under consideration. <br /> 7 Alan Dorman said one site is being considered at this time and up to two sites can be <br /> 8 considered in the contract. <br /> 9 Chair Bedford said a previously considered site is no longer available. <br />