Orange County NC Website
Appendix C: Funding and Implementation Plan SHSHORT RANG COUNII' <br /> CAPITAL IMPROVEMENT <br /> STRATEGIES <br /> Each capital improvement strategy represents a type of capital <br /> project with multiple locations recommended for each type. <br /> These strategies do not include capital projects that are required <br /> for basic operation of the transit service strategies, such as new <br /> bus stops for new services. Site locations were prioritized into <br /> medium and long term based on the evaluation matrix, inclusion <br /> of the projects in other adopted plans, and existing infrastructure <br /> at each site. The three types of capital improvement strategies <br /> include: <br /> ■ Bus Stop Improvements <br /> ■ Rural Mobility Hubs <br /> ■ Walking Access to Transit <br /> Nelson\Nygaard Consulting Associates 24 <br />