Browse
Search
Agenda - 11-21-2005-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-21-2005
>
Agenda - 11-21-2005-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:36:27 PM
Creation date
8/29/2008 10:41:17 AM
Metadata
Fields
Template:
BOCC
Date
11/21/2005
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20051121
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br />LAND USE DENSITY OPTION DESCRIPTIONS <br />OPTION 1 <br />Medium-Low Density Plan <br />New Rural Buildout Units: 75,000 ± <br />New Urbanizing Buildout Units: Variable <br />Depends on Rezoning Potential <br />4,500 Acres Available <br />Existing Dwellings: 13,600+ <br />(Both Rural and Urbanizing) <br />Gross Rural Buildout Density: 1 du / 2.40 ac ± <br />Possible Total Population at Buildout: 210,000 ± <br />(Orange County Planning Jurisdiction) <br />Note: Does not include municipalities. As a comparison, the existing land use/zoning <br />plan would permit'on paper' 145,000 new units and 345,000 new population. <br />GOALS <br />1.1a Water Supply Protection <br />1.1b Some Rural Character Protection <br />LAND USE CHANGE HIGHLIGHTS <br />1.2a Reduces Buildout population and density in rural areas but not as low as <br />historic densities. <br />1.2b Changes Upper Eno water supply watershed to same lower density <br />program presently in Cane Creek and University Lake. <br />1.2c Lowers future density in rural areas to approximately 1 house per 2 to 2.5 <br />acres, if soils permit. <br />1.2d Identifies suburban areas where growth may occur without public water <br />and sewer in short term, <br />G'.\Comprohensive Piannin~ Div\GENE\2005 Puhlic HearingsVNOV?7\OCCP-LUEPolicy0ptions\Land Use Density Option Deuriptions 17 ~5~5 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.