Orange County NC Website
Planning for the Future: <br />Orange County Planning Jurisdiction <br />Additional Growth <br /> l~ <br />~ `t o $'' <br />9r c1 ~ ~ <br />s® <br />~ (- d fL0 <br /> ti.. ~. <br />V ® ~ <br />~ ~ ~ N <br />® N <br />1® <br />~ J <br /> G. <br /> <br />a° <br />Jtw <br />o~ <br />na , <br />J~ <br />+ 130,000 DU <br />+ 300,000 Population <br />+ 102,000 DU <br />%~~ J~~~'oa°,--'® +240,000 Population <br />' <ba~\~ <br />v , <br />Quality of Life Eeiling?,-'" ~"" ~ + 60,000 DU <br />~rb~ + 145,000 Population <br />~/ - ~~~°5,000 P,~B~ <br />.• - <br />•'. --~1rf~an)REiral l~griculture ~ "907,000 ~~a~s~99c'~, 48~?i3 <br />,:f~u[~(-Orange -2000 <br />~~ 20,000 DU <br />I Time Buildout I <br />Option 1 on paper could be as much as 150,000 dwelling units, but 14% was removed from <br />developable land because of floodplain constraints. Since density and minimum lot size are similar <br />in many areas, the constrained areas cannot be absorbed easily into the subdivision, therefore the <br />lower number is used. <br />