Browse
Search
Agenda - 10-01-2024; 8-j - Approval of a Revised Professional Engineering Services Contract with Schnabel Engineering South, P.C. for the Lake Orange Intake Tower Rehabilitation-Replacement Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 10-01-2024 Business Meeting
>
Agenda - 10-01-2024; 8-j - Approval of a Revised Professional Engineering Services Contract with Schnabel Engineering South, P.C. for the Lake Orange Intake Tower Rehabilitation-Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 2:08:09 PM
Creation date
9/26/2024 1:52:00 PM
Metadata
Fields
Template:
BOCC
Date
10/1/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-j
Document Relationships
Agenda for October 1, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 10-01-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 1, 2024 <br /> Action Agenda <br /> Item No. 8-j <br /> SUBJECT: Approval of a Revised Professional Engineering Services Contract with <br /> Schnabel Engineering South, P.C. for the Lake Orange Intake Tower <br /> Rehabilitation-Replacement Project <br /> DEPARTMENT: Planning and Inspections <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> 1. Revised Professional Services Christopher Sandt, County Engineer, <br /> Contract (over $90,000) — Lake 919-245-2583 <br /> Orange Intake Tower Cy Stober, Planning Director, 919-245- <br /> Rehabilitation-Replacement 2592 <br /> PURPOSE: To approve a revised professional engineering services contract in the amount of <br /> $288,000 with Schnabel Engineering South, P.C. for the Lake Orange Perimeter Survey project <br /> (hereafter the "Project"). <br /> BACKGROUND: A previous version of this contract was approved by the Board of County <br /> Commissioners (BOCC) on the Consent portion of the agenda at the June 18, 2024 Business <br /> meeting. Extensive background information for the proposed project is available in the June <br /> meeting materials: http://server3.co.orange.nc.us:8088/WebLink/0/doc/72913/Pagel.aspx. <br /> The Provider subsequently requested minor text revisions to the contract document, as <br /> incorporated into and highlighted within Attachment 1. The revisions requested by the Provider <br /> include minor text amendments, date adjustments, and the elimination/deletion of Section 2.b.vi. <br /> This section was eliminated/removed based on consultant feedback that they will provide one <br /> initial set of final plans and specifications for the project, per industry standards. Any re-design <br /> and/or additional design work that may be warranted after the solicitation of construction bids will <br /> be addressed via amendment(s) to the professional services contract, subject to budget <br /> availability and final review by the County Attorney. <br /> FINANCIAL IMPACT: The negotiated professional services agreement and any subsequently <br /> approved amendments to the agreement will not exceed the appropriated Project budget. <br /> ALIGNMENT WITH STRATEGIC PLAN: This item supports: <br /> • GOAL 1: ENVIRONMENTAL PROTECTION AND CLIMATE ACTION <br /> OBJECTIVE 6. Protect water supply/watersheds. <br /> RECOMMENDATION(S): The Manager recommends that the Board: <br />
The URL can be used to link to this page
Your browser does not support the video tag.