Browse
Search
Agenda - 10-01-2024; 8-i - Construction Bid Award for the Motor Pool, Maintenance Shop, and Public Transportation Automatic Transfer Switches and Generator Power
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 10-01-2024 Business Meeting
>
Agenda - 10-01-2024; 8-i - Construction Bid Award for the Motor Pool, Maintenance Shop, and Public Transportation Automatic Transfer Switches and Generator Power
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 2:07:52 PM
Creation date
9/26/2024 1:51:38 PM
Metadata
Fields
Template:
BOCC
Date
10/1/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda for October 1, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 10-01-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> OC Motor Pool and Maintenance Shop <br /> Section 00 52 00 - BID/ACCEPTANCE FORM <br /> for <br /> ORANGE COUNTY MOTOR POOL AND MAINTENANCE SHOP <br /> This project consists of the following: <br /> Motor Pool - Rework standby generator system to automate the change-over. <br /> Admin Building -Add a standby gas-fired generator and rework the power distribution, <br /> Maintenance Facility - Relocate an existing gas generator to the existing maintenance facility, tie into <br /> system, and make modifications as needed. <br /> We are in receipt of <br /> Addendum 2 Addendum 3 <br /> Addendum 1 <br /> Addendum 4 Addendum 5 Addendum 6 <br /> The undersigned, as bidder, proposes and agrees if this bid is accepted to contract with ORANGE COUNTY, <br /> NORTH CAROLINA for the furnishing of all materials, equipment, and labor necessary to complete the <br /> construction of the work described in these documents in full and complete accordance with plans, <br /> specifications, and contract documents, and to the full and entire satisfaction of the Own�xf�yr he_sumC�of: <br /> BASE BID MOTOR POOL SCOPE QA)ei ) liz OI�P. O aDolla'rs $ O� J <br /> ALTERNATE#1 BID: ADMINISTRATION BUILDING SCOPE(ADD/DEDUCT) Dollars $�W d l0(�p1 7 <br /> ALTERNATE#2 BID: MAINTENANCE FACILITY SCOPE <br /> (ADD/DEDUCT) Dollars <br /> General Subcontractor License#: <br /> Electrical Subcontractor .,h� License#: <br /> , <br /> Respectively submitted this I day of AQg, A44 2021 <br /> "amtoA4 AStCYj a4f St1v-\c <br /> (Contractor's N ) <br /> By:. <br /> Title: PPr«; (Owner, partner, corp. Pres. Or Vice President) <br /> Address:3lo4 � M�t�s R&L-61 Urv,ax, Nc 'A-Q33 <br /> Email Address:m;ch421®hamta Yfa <br /> (Corporate Sea]) <br /> License#: q(oag <br /> ACCEPTED by <br /> Total amount of accepted by the owner, included base bid and bid alternates: <br /> TITLE: <br /> END OF SECTION 00 52 00 <br /> PDC Project 23017 BID/ACCEPTANCE FORM 00 52 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.