Browse
Search
09.30.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
09.30.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 1:12:57 PM
Creation date
9/24/2024 12:44:35 PM
Metadata
Fields
Template:
BOCC
Date
9/30/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C: Funding and Implementation Plan ORA RANG ETRANSIT OUNT�Y <br /> DISCONTINUE ORANGE-ALAMANCE CONNECTOR (CONT.) <br /> Funding sources: This project does not require funding. Savings from this project can be used to support the operation of the Mebane <br /> Circulator. <br /> Project Phase I Annual Revenue Hours � Fiscal Year 06 � Fiscal Year 2027 Fiscal Year 202809 Fiscal Year 2030 <br /> Existing 2,500 - - - - - <br /> Proposal 0 $0 $0 $0 $0 $0 <br /> Implementation steps: <br /> 1. Inform residents and riders of proposed service change through processes defined in OCTS's Title VI Plan. <br /> 2. Place signage at existing Orange-Alamance Connector stops to notify riders of service change and provide information on other <br /> services along the corridor, including MOD. <br /> 3. Remove Orange-Alamance Connector from website and provide information on available alternatives for residents along the <br /> corridor, including MOD. <br /> 4. Use funds for other approved transit operating costs. <br /> Nelson\Nygaard Consulting Associates 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.