Browse
Search
09.30.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
09.30.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 1:12:57 PM
Creation date
9/24/2024 12:44:35 PM
Metadata
Fields
Template:
BOCC
Date
9/30/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B:Strategies Evaluation SHORT PGGEETROUN� ANSIT TY <br /> LAN <br /> 4 PRIORITIZED on materials and construction costs from national and regional <br /> sources, such as the Wake Bus Plan, and adjusted for inflation. <br /> CAPITAL PROJECTS Site specific considerations, such as existing infrastructure and <br /> property ownership, were taken into account after initial <br /> Within the three overarching Capital Improvement strategies, prioritization when creating the implementation plan. Once these <br /> there are multiple proposed project locations. Costs were projects move into design and implementation phases, costs will <br /> estimated for each type of capital project based on data collected be adjusted to meet location-specific needs. <br /> Figure 4 Prioritized Capital Projects with Detailed Scores <br /> Project Type and Location Communities Jobs People Easy and Regional Local Reduces Activity Strategy Total <br /> of Concern Served served Safe Connections Transit Duplication Centers Cost Score <br /> Walking Access to Transit: <br /> Faucette Mill Road/Cornelius <br /> Street 3(3) 256(2) 549(3) High(3) Low(1) High(3) Medium(2) 0(1) $254,470(1) 19 <br /> Bus Stop Improvements: <br /> Mebane Community Park 0(1) 188.5(2) 267.5(2) High(3) Low(1) High(3) Medium(2) 1 (2) $45,360(3) 19 <br /> Bus Stop Improvements: <br /> Cornelius St/Rainey Ave 2.5(2) 183.5(2) 415(3) High(3) Low(1) High(3) Medium(2) 0(1) $45,360(3) 19 <br /> Bus Stop Improvements:Orange <br /> Grove Rd 2.33(2) 48(1) 775(3) High(3) Low(1) High(3) Medium(2) 0(1) $45,360(3) 19 <br /> Bus Stop Improvements: NC 86 <br /> Cornerstone Court 1.5(1) 943(3) 121 (2) High(3) Low(1) High(3) Medium(2) 0(1) $45,360(3) 19 <br /> Rural Mobility Hubs: Supper <br /> Club Blvd 3(3) 97(1) 531 (3) High(3) Medium(2) Medium(2) Medium(2) 0(1) $111,758(2) 19 <br /> Walking Access to Transit: <br /> Mebane Food Lion 0(1) 129(2) 342(2) High(3) Low(1) High(3) Medium(2) 2(3) $254,470(1) 18 <br /> Rural Mobility Hubs: Fairview <br /> Park/Dorothy Johnson <br /> Community Center 4(3) 22(1) 127(2) High(3) Medium(2) Medium(2) Medium(2) 0(1) $111,758(2) 18 <br /> Rural Mobility Hubs: NC Driver's <br /> License Office 2.67(2) 59(1) 145(2) High(3) Medium(2) Medium(2) Medium(2) 1 (2) $111,758(2) 18 <br /> Nelson\Nygaard Consulting Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.