Browse
Search
09.30.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
09.30.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 1:12:57 PM
Creation date
9/24/2024 12:44:35 PM
Metadata
Fields
Template:
BOCC
Date
9/30/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED /N BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS # Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207G 50502 NC 87 (East Webb Avenue) at Flanner Street, Pedestrian signal 5/11/23 12/31/23 $60,000 Planning and design activities Dawn McPherson <br /> installation and crosswalk pavement markings. underway. Utility relocations <br /> underway. Concrete work complete. <br /> Resurfacing and Pavement Markings <br /> Pending. <br /> U-6011 Intersection improvements at US 70 (South Church Street) and 9/19/24 FY2027 $3,000,000 Planning and design activities Chris Smitherman <br /> 47146.1 .1 SR 1158 (Huffman Mill Rd) in Burlington underway - ROW Certified. Utilities <br /> 47146.2.1 underway. <br /> 47146.3.1 <br /> 15BPR.54 Rehab on Structure #197 in Guilford County on SR 1117 (S. 1/21/25 FY2028 $5,000,000 Planning and design activities Kristy Alford <br /> Holden Street) over 1-85 Business and on Structure #148 on 1-40 underway <br /> over Haw River in Alamance County <br /> 1-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/21/25 FY2027 $48,000,000 Planning and design activities Brian Ketner <br /> 48689.1 .1 (Trollingwood-Hawfields Road) in Mebane underway. CMGC delivery. <br /> 48689.2.1 <br /> 48689.3.1 <br /> 50547 NC 49 at Green Level Church Road/James Boswell Road - 4/17/25 FY2026 $650,000 Planning and design activities Trung Nguyen <br /> Realign Intersection underway. 25% plans complete. <br /> meeting to be scheduled. <br /> U-6014 Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with 5/20/25 FY2027 $13,200,000 Planning and design activities Suzana Matta <br /> 47159.1 .1 Bicycle/Pedestrian accommodations from SR 1720 (West underway, Includes EB-5882. ROW <br /> 47159.2.1 Hanover Rd) to Morningside Drive in Burlington Acquisition underway. <br /> 47159.3.1 <br /> BR-0060 Replace Bridge #14 on NC 14 over Cane Creek 9/16/25 FY2026 $5,900,000 Planning and design activities David Stutts <br /> underway <br /> EB-5885 Construct sidewalk on US 70 (N. Church St.) from Beaumont 9/25/25 FY 2027 $120,000 Municipal Agreement required to begin City of <br /> Avenue to SR 1716 (Graham Hopedale Road) work Burlington/Stephen <br /> Robinson <br /> EB-5879 Construct sidewalk on US 70 (N. Church St.) from SR 1716 9/25/25 FY2027 $200,000 Municipal Agreement required to begin City of <br /> (Graham Hopedale Road) to SR 1719 (Sellars Mill Road) work Burlington/Stephen <br /> Robinson <br /> U-6131 Install dual left turn lanes in westbound direction at NC 54 (W. 1/15/26 FY2028 $3,500,000 Planning and design activities pending Brandon Green <br /> Harden Street) at NC 49 (Maple Ave.) in Burlington <br /> EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave. to SR 1454 8/25/26 FY2028 $272,000 Municipal Agreement required to begin Town of <br /> (W. Haggard Ave.) in Elon work Elon/Stephen <br /> Robinson <br /> AV-5851 Construct 100' paved overrun and make safety enhancements at 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby <br /> the Burlington-Alamance Regional Airport underway <br /> BGMPO Aug 2024 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.