Orange County NC Website
ORANGE COUNTY <br /> SHORT RANGE TRANSIT PLAN <br /> Capital Improvement <br /> Strategies <br /> Each capital improvement strategy represents a type of capital <br /> project with multiple locations recommended for each type. <br /> These strategies do not include capital projects that are required <br /> for basic operation of the transit service strategies, such as newr� <br /> bus stops for new services. Site locations were prioritized into <br /> medium and long term based on the evaluation matrix, inclusion <br /> of the projects in other adopted plans, and existing infrastructure <br /> at each site. The three types of capital improvement strategies NSF.UWWAAK <br /> include: � <br /> z , <br /> ■ Bus Stop Improvements <br /> ( 'i, , � . 0 <br /> ■ Rural Mobility Hubs .74 <br /> - <br /> o, �OranpS?! y <br /> ■ Walking Access to Transit - <br /> 0 <br /> Nelson\Nygaard Consulting Associates <br />