Orange County NC Website
35 <br /> 1 Slide#12 <br /> What Changed? <br /> NCSL 23-137/1-113 600 (2/2) <br /> • Amended NCGS 143-214.7 (Stormwater Runoff <br /> Rules and Programs) <br /> — Excludes public rights of way from impervious surface <br /> calculations and regulation/treatment <br /> — Better enables redevelopment of properties being <br /> introducing flexibility on "crediting" existing <br /> development footprints <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br /> 2 <br /> 3 Commissioner Portie-Ascott asked if this would allow someone to put a quadruplex on an <br /> 4 acre that was subdivided into four parcels. <br /> 5 Cy Stober said no. He said it does not transmit the development rights to a new property. <br /> 6 He said it would all have to be contained within the currently existing property. He said if someone <br /> 7 wanted to have a small office complex and it is consistent with the zoning, then you could have <br /> 8 four new buildings. He said that would still have to account for parking and driveways. <br /> 9 <br /> 10 Slide #13 <br /> Proposed Amendments <br /> • The following statutory language is needed in a new <br /> subsection (C) "Redevelopment Exemption to <br /> Section 6.14.5(Stormwater Management, <br /> Applicability): <br /> Id= � <br /> ORANGE COUNTY <br /> NORTH fAROLINA <br /> 11 <br /> 12 <br /> 13 <br />