Orange County NC Website
The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily <br /> penetrate into accumulated sediments . <br /> When the permanent pool depth reads 4 . 0 feet in the main pond, the sediment shall be removed . <br /> When the permanent pool depth reads 4 . 0 feet in the forebay, the sediment shall be removed . <br /> BASIN DIAGRAM <br /> PPV <br /> PPE 613 . 5 <br /> 1/7 <br /> SRE 60905 ♦ V <br /> - - - - - - - - - - SRE 609 . 5 <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> BE 608 . 5 1 -foot <br /> - - <br /> BE 608 . 5 Min . SS <br /> FOREBAY <br /> 1 -foot Min . SS MAIN POND <br /> Diagram Abbreviations : <br /> BE = Bottom Elevation <br /> SRE = Sediment Removal Elevation <br /> PPE = Permanent Pool Elevation <br /> PPV = Permanent Pool Volume <br /> SS = Sediment Storage <br /> V = Volume <br /> Min . Minimum <br /> Operation and Maintenance Agreement Runs with Property. The terms herein contained are binding on the present owners , and their <br /> successors in title and interest, and shall henceforth be appurtenant to , and shall run with the title to said real property . <br /> Page 4 of 4 <br />