Orange County NC Website
EXHIBIT B <br /> STORMWATER CONTROL MEASURE <br /> OPERATION AND MAINTENANCE MANUAL <br /> STORMWATER MANGEMENT <br /> PLAN PROJECT NUMBER . SW2019 - 04 <br /> NAME OF PROJECT . Orange County Northern Campus (formerly known as Orange County Detention Center) <br /> DESCRIPTION OF PROJECT <br /> The Project consists of a new institutional development with associated buildings , parking, open space, landscaping, utility, and <br /> stormwater management improvements consisting of one Wet Detention Basin, generally referred to as Stormwater Control Measure <br /> ( SCM) . The SCM is identified as " STORMWATER MANAGEMENT POND" on the approved Construction Drawings entitled <br /> " ORANGE COUNTY NORTHERN CAMPUS " with a latest revision date of June 25 , 2019 . A copy of the approved plans for the <br /> project is on file with the Town of Hillsborough Community Services Department, Planning Division , <br /> OWNER CONTACT INFORMATION <br /> Printed Name : Orange County <br /> Point of Contact Name : Bonnie B . Hammersley <br /> Title : County Manager <br /> Mailing Address : 200 South Cameron Street, P . O . Box 8181 , Hillsborough, NC 27278 <br /> Phone Number . (919) 245 -2300 <br /> OPERATION AND MAINTENANCE CONDITIONS <br /> The property owner shall keep a separate maintenance record on each of the SCMs . These maintenance records shall be kept in a log <br /> in a known set location on the project site . Any deficient SCM elements noted in the inspections shall be corrected, repaired or <br /> replaced immediately . These deficiencies can affect the integrity of structures , safety of the public, and the removal efficiency of the <br /> SCMs . <br /> Page 1 of 4 <br />