Orange County NC Website
6 <br /> EXHIBIT B <br /> STORMWATER CONTROL MEASURE <br /> OPERATION AND MAINTENANCE MANUAL <br /> STORMWATER MANGEMENT <br /> PLAN PROJECT NUMBER: SW2019-04 <br /> NAME OF PROJECT: Orange County Northern Campus(formerly known as Orange County Detention Center) <br /> DESCRIPTION OF PROJECT <br /> The Project consists of a new institutional development with associated buildings,parking,open space,landscaping,utility,and <br /> stormwater management improvements consisting of one Wet Detention Basin,generally referred to as Stormwater Control Measure <br /> (SCM).The SCM is identified as"STORMWATER MANAGEMENT POND"on the approved Construction Drawings entitled <br /> "ORANGE COUNTY NORTHERN CAMPUS"with a latest revision date of June 25,2019.A copy of the approved plans for the <br /> project is on file with the Town of Hillsborough Community Services Department,Planning Division. <br /> OWNER CONTACT INFORMATION <br /> Printed Name: Orange County <br /> Point of Contact Name: Bonnie B.Hammersley <br /> Title: County Manager <br /> Mailing Address: 200 South Cameron Street,P.O.Box 8181,Hillsborough,NC 27278 <br /> Phone Number: (919)245-2300 <br /> OPERATION AND MAINTENANCE CONDITIONS <br /> The property owner shall keep a separate maintenance record on each of the SCMs.These maintenance records shall be kept in a log <br /> in a known set location on the project site.Any deficient SCM elements noted in the inspections shall be corrected,repaired or <br /> replaced immediately. These deficiencies can affect the integrity of structures, safety of the public,and the removal efficiency of the <br /> SCMs. <br /> Page 1 of 4 <br />