Browse
Search
Agenda - 11-15-2005-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-15-2005
>
Agenda - 11-15-2005-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:28:34 AM
Creation date
8/29/2008 10:41:00 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20051115
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• At the October 18 Board meeting, the Board approved an Energy Conservation Manager <br />appointment and the search is now underway far an emplayee to assume these <br />responsibilities. <br />• At November 15 Board meeting, staff will present for the Board's consideration a draft <br />Energy Conservation Policy designed to reduce energy consumption in Caunty government <br />facilities and improve energy efficiency both as a cost savings measure and to protect the <br />environment. <br />• Also at the November 1,5 Baard meeting, staff will present a report on County building <br />energy costs, energy consumption and possible performance measures far tracking <br />progress. <br />• At the December 5 Board meeting, staff will present a draft vehicle energy conservation <br />policy for the Board's consideration to address the need to promote fuel efficiency and fuel <br />cost savings, <br />• Also at the December 5 Board meeting, staff will present a report on vehicle fuel costs, <br />cansumption and possible performance measures for tracking progress. <br />FINANCIAL IMPACT: There is no financial impact of adopting the Environmental Responsibility <br />Goal. The action strategies that would be created to implement the goal may have financial <br />impacts that are not yet known. In terms of the energy conservation initiative, a primary <br />consideration is to reduce energy costs and/or mitigate energy cast increases. Costs <br />associated with specific equipment, system improvement or system replacement will be <br />addressed through the Capital Improvement Plan process. <br />RECOMMENDATION(S): The Manager recommends that the Baard discuss and adopt the <br />attached draft Environmental Responsibility Goal, with changes as desired. <br />
The URL can be used to link to this page
Your browser does not support the video tag.