Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:12:13 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
Minutes 09-17-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-069-Performance Agreement Between Orange County and Morinaga
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-070-FY26 Local Share Certification for Funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-071-Public Hearing Record
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-072 Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-073-Petition for Annexation of Contiguous Property
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-075-Stormwater Control Measure Easement and Maintenance Agreement with Town of Hillsborough
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-014-Emergency Management Professionals' Day
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-015-Orange County Preparedness Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-016-Adult Education and Family Literacy Week
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-049-Public Transportation Program Resolution - FY26
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-050-Resolution Authorizing Upset Bid Process for 0.2‐acre plot, PIN #9863668263
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49 <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C---Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or LOCATION: <br /> (Definitions/explanations are provided on pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> A. Site Preparation <br /> 1. Demolition $0 <br /> 2. Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4. Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6. Electrical(Includes TV&Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone, Data,Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1. Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. If using lump sum,make entry in$field. <br /> DESIGN FEE % (%of Estimated Construction Costs) $0 <br /> PRECONSTRUCTION <br /> COSTS % (%of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (%of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est.Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation%) $0 <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> 18 <br /> Revised 01/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.