Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:12:13 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 09-17-2024 Business Meeting
Minutes 09-17-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-069-Performance Agreement Between Orange County and Morinaga
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-070-FY26 Local Share Certification for Funding
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-071-Public Hearing Record
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-073-Petition for Annexation of Contiguous Property
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-075-Stormwater Control Measure Easement and Maintenance Agreement with Town of Hillsborough
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-014-Emergency Management Professionals' Day
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-015-Orange County Preparedness Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
PRO-2024-016-Adult Education and Family Literacy Week
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-049-Public Transportation Program Resolution - FY26
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-050-Resolution Authorizing Upset Bid Process for 0.2‐acre plot, PIN #9863668263
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37 <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its efforts, including <br /> providing additional manpower or overtime, as necessary,to perform its services in accordance with the Key Milestone Listing at no additional cost to <br /> the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully executed <br /> original of this Agreement. <br /> 6.2 Adjustments to the Schedule <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty (60) days through no fault of the Designer, or if the Owner <br /> increases or decreases the scope or size of the Project by ten percent (10%) of currently estimated Total Project Cost,the Designer shall give prompt <br /> written notice to the Owner. Provided that such notice has been given,the Designer may request in writing an adjustment in the Key Milestone Listing <br /> dates, which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase. (Insert Lump Sum or Time and Materials as appropriate) fee of <br /> 7.2.2 Design Development Phase. fee of <br /> 7.2.3 Construction Document Phase. Lump sum fee of <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of <br /> 7.2.5 Construction Phase. Lump sum fee of <br /> 7.2.6 Post Construction Phase. Lump sum fee of <br /> 7.2.7 Additional Basic Services (Select all that apply): <br /> fee of <br /> fee of <br /> fee of <br /> fee of <br /> 7.3 Payment for Basic Services Rendered, as described in Attachment B <br /> 7.3.1 Payment to the Designer for Basic Services shall become due and payable as progress deliverables and categories of services are completed. <br /> Upon completion of each category, payment will be made by the Owner within 30 calendar days of receipt of an invoice which is in form and substance <br /> 6 <br /> Revised 01/24 <br />