Orange County NC Website
25 <br /> 5410 Trinity Road P 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleigh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> Proposed Fee Summary <br /> Survey Services <br /> Task S01 — Control and Boundary Survey $ 7,000 Fixed Fee <br /> Task S02 —Topographic Survey $ 12,000 Fixed Fee <br /> Task S03 — Underground Utility Location $ 2,500 Fixed Fee <br /> Task SO4 — Recombination Plat $ 4,500 Fixed Fee <br /> Task S05—Annexation Plat & Description $ 2,500 Fixed Fee <br /> Geotechnical Services <br /> Task G01 —Geotechnical Services (Not to Exceed) $ 27,500 T&M <br /> Task G02 —Clearing Fee (Not to Exceed) $ 7,500 T&M <br /> Water/Wastewater Services <br /> Task U01 — Hydrant Flow Testing $ 2,000 Fixed Fee <br /> Task UO2—Water System Hydraulic Analysis $ 5,000 Fixed Fee <br /> Environmental Services <br /> Task W01 —Wetland/Stream Delineation $ 4,600 T&M <br /> Task W02 —Wetland/Stream Confirmation & Buffer Determination $ 4,600 T&M <br /> Task W03 — Phase 1 ESA $ 4,200 T&M <br /> Task W04 — Protected Species Review & Consultation $ 2,000 T&M <br /> Task W05—Tree Inventory $ 26,000 T&M <br /> Task W06 — PCN for Nationwide Permit, Water Quality Certificate $ 5,800 T&M <br /> & Buffer Authorization <br /> Task W07 —401/404 & Riparian Buffer Permit Processing $6,000 T&M <br /> Engineer Services <br /> Task E01 —Schematic Design $ 11,500 Fixed Fee <br /> Task E02 — Design Development $ 23,000 Fixed Fee <br /> Task E03 — Construction Documents $ 46,000 Fixed Fee <br /> Task E04 — Bidding $ 2,875 Fixed Fee <br /> Task E05— Construction Administration $ 28,750 Fixed Fee <br /> Task E06 — Project Closeout $ 2,875 Fixed Fee <br /> Task E07 — Permitting $ 15,000 Fixed Fee <br /> Task E08— Special Use Permit Assistance (if required) $ 12,500 Fixed Fee <br /> Task E09— Rezoning Assistance (if required) $ 15,000 Fixed Fee <br /> Landscape Architecture Services <br /> Task L01 — Code Compliant Planting Plan $ 10,000 Fixed Fee <br /> Task L02 — Enhanced Planting Plan & Amenity Space/Hardscape/ $ 12,500 Fixed Fee <br /> Streetscape Design <br /> Task L03 — Construction Administration $ 5,800 Fixed Fee <br /> Task L04 — Closeout $ 1,800 Fixed Fee <br /> TOTAL PROPOSED FEE $311,300.00 <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 19 of 22 <br />