Orange County NC Website
21 <br /> 5410 Trinity Road P 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> Task E05 -Construction Administration <br /> Construction administration services are based on a 14-month construction schedule. <br /> • Attend Pre-Construction Conference <br /> • Site Visits During Related Construction Activities <br /> • Review Submittals & Shop Drawings <br /> • Miscellaneous Construction Administration <br /> • Punchlist Inspection <br /> Task E06 - Project Closeout <br /> The design team will prepare record drawings based on red-lined drawings from the contractor as well as <br /> contribute as necessary to any O&M manuals prepared by CPL. <br /> • Water and Sewer Certifications as required <br /> • SCM Certification <br /> • Back-Punch Inspection <br /> • Compilation of Contractor's Record Dwgs. <br /> Task E07 - Permitting <br /> • Pre-application meeting suggested. Applicable town & county staff will be invited to attend & answer <br /> any questions. <br /> • The design team will coordinate with the Town of Hillsborough for all site development permitting <br /> submittals. <br /> • Apply for town-issued ZCP (Zoning Compliance Permit). <br /> • Construction drawing review by TRC. <br /> • Assist with Nitrogen offset fee calculation, Erosion Control Surety Calculations, and Public <br /> Improvement Surety Calculations <br /> • Site Plan & application materials reviewed by TRC. All TRC comments must be addressed before <br /> application will be scheduled for hearing before the Board of Adjustment. <br /> • Revise plans and respond to Town review Comments <br /> • Submit to NCDEQ for Erosion and Sediment Control Permits <br /> • NCDEQ Water and Sewer Permits as required <br /> • NCDOT driveway Permits <br /> • NCDOT Encroachment agreements <br /> Task E08—Special Use Permit Assistance (if required) <br /> Timmons Group will assist the client with preparation and submittal of the required special use plan <br /> application package to the Town of Hillsborough as noted below for this process. <br /> • Attend pre-application conference with the Town of Hillsborough <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 15 of 22 <br />