Orange County NC Website
19 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> not include mitigation fee payment, or payment of NCDEQ DWR's review fee. This task also includes <br /> additional time spent for site plan revisions and additional RAls. <br /> Items NOT included in the Scope of Services of this Agreement: <br /> Timmons Group will only perform services authorized per this agreement. Anything not expclitly listed will not <br /> be completed, this includes but is not limited to the below which can be added for an additional fee. <br /> • Traditional survey of wetland flags <br /> • Phase II or III Environmental Site Assessments <br /> • Protected Species Surveys <br /> • Historical Resource Coordination/Surveys <br /> • Permitting Fees (application fees, cost of public notices, mitigation costs, etc.) <br /> • Nutient Offet Mitigation Credit Coordination <br /> • Mitigation Design <br /> • Pre-Application Meetings <br /> • Wetland Permit Compliance <br /> ENGINEER SERVICES <br /> Task E01 -Schematic Design <br /> The team will prepare schematic design level construction drawings based on the final concept design. <br /> Coordination of initial permitting requirements with the Town of Hillsborough <br /> • Utility availability investigation <br /> • Coordinate Layouts with Architect& Owner <br /> • Revise Layouts Per Review Comments <br /> • Utility System Concept Plan <br /> • Stormwater Management Concept Plan <br /> • Team Coordination & Meetings <br /> • Coordination with NCDOT <br /> • Project Management& QA/QC <br /> Upon completion of schematic design, the team will contribute to the Design Narrative documenting the <br /> schematic design phase. The team will document project requirements, design parameters and objectives and <br /> the results of the schematic design meetings and will provide any necessary text or graphics to supplement the <br /> narrative prepared by CPL. <br /> Task E02 - Design Development <br /> The design team will prepare Design Development construction drawings based on the approved schematic <br /> design drawings. <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 13 of 22 <br />