Orange County NC Website
11 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> Task SO4 - Recombination Plat <br /> The plat will meet the recordation requirements for the governing municipality. This task also includes <br /> submission of the plat for review and making revisions per review comments but does not include submission <br /> or recordation fees. These fees can be billed as a reimbursable expense. The fee includes setting iron rods. <br /> Exclusions— Field locating wetland/stream flags, subdivision platting, offsite surveys, ALTA, tree surveys <br /> Task S05 -Annexation Plat and Description <br /> Utilizing the survey data collected from task items S01 Timmons group shall prepare an annexation plat and <br /> description for the property acceptable to Planning Department. The plat and description will be based upon <br /> the Boundary Survey as completed by Timmons Group and the record deed information. The annexation <br /> plat and description will be stamped and sealed by a professional Land Surveyor licensed by the State of <br /> North Carolina. <br /> This task does not include the Governmental intake, processing, review, approval or recording fees, all <br /> Governmental fees are the responsibility of the client. <br /> Client Responsibilities <br /> The Client is to provide the Timmons Group Land Surveyors with complete and unencumbered access to <br /> the property and adjacent properties as needed to complete the field surveying work. <br /> GEOTECHNICAL SERVICES <br /> Task G01 —Geotechnical Services <br /> Our proposed scope of geotechnical services will consist of performing soil test borings, laboratory testing of <br /> soils, and preparation of a geotechnical engineering report. At the time of this proposal, a site layout and <br /> grading plan was not available. Our assumptions and proposed tasks are discussed below. <br /> Assumptions <br /> This geotechnical scope assumes the following conditions. If conditions vary from those assumed below <br /> adjustments to the fee may be required: <br /> • As the location of the site for development has not been finalized, no information is known regarding <br /> tree cover. This scope assumes that no more than 3 days of clearing will be needed to access boring <br /> locations. If 3 days is not adequate to reach boring locations, additional fee will be required to complete <br /> the scope. <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 5of22 <br />