Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.SIMILAR PROJECTS 77 <br /> Caldwell County Crisis and Detox Center <br /> Caldwell County <br /> 5a. Project Name: Caldwell County Crisis The FBC was an approximate 5,200 sq. ft. addition to <br /> and Detox Center an existing outpatient facility that has 12-beds to serve <br /> Date of the Project: 2017 adults with mental health issues, substance abuse <br /> 5b. The Location of the Client: Lenoir, NC issues, and developmental disabilities. It will offer 24hr <br /> care to those in need, and combined with the outpatient <br /> 5c. A Contact Name Including Relevant Contact center, will provide a continuum of care offering <br /> Information: Sandy Feutz, Chief Operating Officer counseling and medication management for <br /> (RHA Health Services) Tel: 828.775.1264 long-term recovery. <br /> CPL was hired by Caldwell County, in conjunction with During the design process CPL worked closely with <br /> RHA Health Services, to provide architectural and RHA to ensure proper materials, fixtures, and finishes <br /> engineering design services for a new Facility Based were specified for the safety of patients and staff, <br /> Crisis Center (FBC) that will serve local residents of but also collaborated on making the space a healing <br /> Alexander, Caldwell, and McDowell Counties. environment void of an Institutional feet. <br /> Incorporation of universal room sizes allowed for <br /> future expansion from single to double occupancy <br /> rooms to expand capacity without the need for <br /> horizontal expansion. <br /> 4 <br /> Ij <br /> F <br /> �1 !1 <br /> r <br /> VIX <br /> J� <br /> 24 CPL <br />
The URL can be used to link to this page
Your browser does not support the video tag.