Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> not include mitigation fee payment, or payment of NCDEQ DWR's review fee. This task also includes <br /> additional time spent for site plan revisions and additional RAls. <br /> Items NOT included in the Scope of Services of this Agreement: <br /> Timmons Group will only perform services authorized per this agreement. Anything not expclitly listed will not <br /> be completed, this includes but is not limited to the below which can be added for an additional fee. <br /> • Traditional survey of wetland flags <br /> • Phase II or III Environmental Site Assessments <br /> • Protected Species Surveys <br /> • Historical Resource Coordination/Surveys <br /> • Permitting Fees (application fees, cost of public notices, mitigation costs, etc.) <br /> • Nutient Offet Mitigation Credit Coordination <br /> • Mitigation Design <br /> • Pre-Application Meetings <br /> • Wetland Permit Compliance <br /> ENGINEER SERVICES <br /> Task E01 -Schematic Design <br /> The team will prepare schematic design level construction drawings based on the final concept design. <br /> Coordination of initial permitting requirements with the Town of Hillsborough <br /> • Utility availability investigation <br /> • Coordinate Layouts with Architect& Owner <br /> • Revise Layouts Per Review Comments <br /> • Utility System Concept Plan <br /> • Stormwater Management Concept Plan <br /> • Team Coordination & Meetings <br /> • Coordination with NCDOT <br /> • Project Management& QA/QC <br /> Upon completion of schematic design, the team will contribute to the Design Narrative documenting the <br /> schematic design phase. The team will document project requirements, design parameters and objectives and <br /> the results of the schematic design meetings and will provide any necessary text or graphics to supplement the <br /> narrative prepared by CPL. <br /> Task E02 - Design Development <br /> The design team will prepare Design Development construction drawings based on the approved schematic <br /> design drawings. <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.