Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> 5410 Trinity Road P 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> means). A preliminary wetland delineation map showing the approximate size, shape and location of wetlands <br /> and/or waters of the U.S. present on the subject property will then be prepared. <br /> Task W02 - Wetland/Stream Confirmation & Buffer Determination <br /> Timmons Group will facilitate the confirmation of wetland and stream locations through feature flagging and <br /> submittal of a Jurisdictional Determination (JD) package to the USACE and a Buffer Determination Request <br /> to NCDEQ Division of Water Resources (DWR) (or appropriate local government agency). This package will <br /> consist of a narrative, delineation map, wetland delineation field data sheets, and stream data forms. The <br /> buffer determination package will include similar maps of the streams and stream data forms. Timmons Group <br /> will conduct a joint site visit**with the USACE and NCDEQ DWR (or appropriate local government agency)to <br /> review the site conditions, flagged wetland limits and confirm findings. A Preliminary Jurisdictional <br /> Determination (PJD) concurrence letter or an informal concurrence for the wetland delineation will be <br /> requested from the USACE and a Buffer Determination Letter will be obtained from DWR (or appropriate local <br /> government agency). <br /> Should the agencies not be able to meet jointly, the additional site visit will be billed Time & Materials with <br /> prior approval from the Client. This scope does not include any local government buffer confirmation fees <br /> which may apply. <br /> Task W03 - Phase I ESA <br /> Timmons Group will complete a Phase I Environmental Site Assessment in full compliance with the scope and <br /> limitations of the American Society of Testing and Materials (ASTM) Standard E 1527-21 (Standard Practice <br /> for Environmental Site Assessments: Phase I Environmental Site Assessment Process). <br /> • In accordance with ASTM Standards as prescribed by the United States Environmental Protection <br /> Agency All Appropriate Inquiry (EPA AAI) process, reasonably available environmental regulatory <br /> database listings and historical information will be accessed and reviewed prior to evaluating the <br /> presence and/or locations of recognized environmental conditions (RECs) as defined by ASTM <br /> Standards. Utilized historic resource data will include, but not be limited to, aerial photographs, <br /> city directories, topographic maps, and fire insurance maps. Any identified RECs and/or areas of <br /> potential environmental concern will be a focal point of site inspection. <br /> • Timmons Group will complete a site inspection of the Subject Property which will include a visual <br /> reconnaissance of the immediately adjoining properties. RECs and/or areas of potential <br /> environmental concern will be documented photographically. <br /> • Records on file with the North Carolina Department of Environmental Quality (DEQ), and/or <br /> Orange County, as available, will be reviewed to identify active and/or historic facilities that may <br /> represent a REC or an area of potential environmental concern. Any risk(s) associated with these <br /> facilities will be assessed, as able. <br /> • Per ASTM Standards, an environmental liens search must be completed. An environmental lien is <br /> a charge, security, or encumbrance on title to a property to secure the payment of a cost, damage, <br /> debt obligation, or duty arising out of response actions, cleanup, or other remediation of hazardous <br /> substances or petroleum products. The search for environmental liens must be provided by <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 10 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.