Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> \ I V 11 <br /> TTL � i <br /> --------------- <br /> - -- - - - --------- - ------ <br /> Assumptions: <br /> • Timmons Group anticipates the Client will coordinate site access and will provide any necessary <br /> documentation for field staff performing the work. <br /> • Timmons Group anticipates the Client will facilitate the completion of the necessary access permission <br /> forms for the U.S. Army Corps of Engineers (USACE)for the wetland/stream confirmation. <br /> Time & Material Services <br /> The scope outlined below will be billed based on the actual hours required to complete the work as specified. <br /> If the final project limits exceed 30 acres or the project location changes, additional scope and fee may be <br /> required. <br /> Task W01 -Wetland/Stream Delineation <br /> Timmons Group will review existing, readily obtainable environmental information on the site such as USGS <br /> mapping, aerial photography, NWI mapping and soil survey information. A wetland delineation of the subject <br /> property will be performed in accordance with the 1987 U.S. Army Corps of Engineers (USACE) Wetland <br /> Delineation Manual and appropriate Regional Supplement. A stream determination will be conducted using <br /> the North Carolina Department of Environmental Quality(NCDEQ)Stream Identification methodology, version <br /> 4.11. The flagged wetland limits will be GPS located for mapping purposes (Note that GPS location is for <br /> confirmation and planning purposes and is not a substitute for traditional field survey, and in the event wetlands <br /> and streams may be impacted by the project jurisdictional features should be located by traditional survey <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 9of22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.