Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N 5 GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> • Perform hydraulic calculations based on the available flow and pressure observed during testing <br /> and the projected demands. <br /> • Review and confirm sizing of the on-site water distribution piping to meet the flow and pressure <br /> requirements. <br /> • Provide a model results sheet showing a graphical system layout, design criteria summary and <br /> residual pressure results for domestic scenarios as well as fire suppression. <br /> Assumptions And Clarifications <br /> • This proposal specifically excludes design, permitting, construction administration, and other <br /> construction phase services. <br /> • This proposal does not include survey or SUE. <br /> • Review/Submittal fees are the responsibility of the owner. <br /> • Testing may not be performed per the requirements of NFPA 291 regarding the minimum <br /> required reduction in residual pressure during the test. If testing is required to meet this portion <br /> of NFPA 291, additional fee may be necessary. <br /> • If the existing water system is not capable of supporting the proposed development, additional <br /> system testing, modeling, and the design of remedial improvements may be required, and this <br /> will require additional scope and fee to be negotiated. <br /> • Minimum fire flow (sprinkler, hydrant flow, ISO or IFC) demands shall be determined and <br /> provided by others. <br /> • This scope includes one submission and one revision/resubmittal. Additional revisions and <br /> submissions may require additional fees. <br /> • Unless otherwise specified, hydraulic analyses are based on a single plan of development. If on- <br /> site changes or phased development occurs, additional fee may be required. <br /> Project Schedule <br /> • Perform hydrant testing and provide flow test summary report within four weeks of receiving <br /> written notice to proceed (dependent upon weather and coordination with water system owner). <br /> • Perform hydraulic modeling and provide results sheet within three weeks after all necessary <br /> information is obtained. <br /> ENVIRONMENTAL SERVICES <br /> Under this Agreement, Timmons Group will provide professional services relative to the approximately 7.8-acre <br /> project located on parcels southwest of the intersection of Waterstone Drive and Highway 86 in <br /> Hillsborough, NC (Orange County) outlined below. <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 8of22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.