Browse
Search
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 09-17-2024 Business Meeting
>
Agenda - 09-17-2024; 6-a - Approval of a Professional Services Contract with CPL for the Design of a New Crisis Diversion Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 11:08:57 AM
Creation date
9/12/2024 11:00:19 AM
Metadata
Fields
Template:
BOCC
Date
9/17/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for September 17, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 09-17-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 5410 Trinity Road p 919.866.4951 <br /> Suite 102 F 919.859.5663 <br /> T I M M O N S GROUP Raleiqh, NC 27607 www.timmons.com <br /> YOUR VISION ACHIEVED THROUGH OURS. <br /> EXHIBIT A <br /> SCOPE OF SERVICE <br /> 9873425076, 9873425271, 9873422375. See Exhibit"A" above for the approximate limits of the property <br /> boundary surveying work outlined in pink. This task will include the following items: <br /> • Research, fieldwork and office calculations necessary to accurately locate the property boundaries <br /> according to the requirements established by NC General Statutes. <br /> • 5/8-inch diameter Iron rebars with green fluorescent caps to be set as primary horizontal control <br /> points along the traverse. The existing property corners will be tied into the traverse. <br /> • Horizontal datum for basis of bearing shall be the North Carolina Coordinate System of 1983 <br /> (NCCS83) based upon NAD83, 2011 epoch. <br /> • Field location and mapping of possible encroachments along the perimeter of the property will be <br /> noted based on physical evidence on the date of the survey. <br /> • Interior site improvements will be shown per the topographic survey scoped below. <br /> • Any missing corners along the outer perimeter of the combined parcels will be re-set with 5/8-inch <br /> diameter rebar with a red fluorescent cap. <br /> • Prepare a boundary Survey Map that can be recorded by the client at the Orange County register of <br /> Deeds office. Timmons Group can complete the recordation of the map. This can be completed on a <br /> time and material bases and invoiced as a reimbursable cost. <br /> • Prepare an AutoCAD digital file of the boundary to be used as a base for the civil engineering design <br /> work. <br /> • This survey will be prepared without the benefit of a title commitment therefor all existing easements <br /> may not be shown. <br /> Task S02—Topographic Survey <br /> Task includes preparation of a field run topographical survey for the area to include location of visible <br /> improvements; storm and sanitary sewer alignments with invert data (including 1 structure outside of limits); <br /> and surface indications of subsurface utilities. Contouring to be plotted at a 1' interval. Topographic limits will <br /> include the area outlined in green on Exhibit "A". <br /> Task S03 — Underground Utility Location <br /> An underground utility survey will be performed to designate and map underground facilities within the <br /> topographic limits. This utility survey will include horizontal designation through geophysical methods and is <br /> defined as Quality Level "B" by the American Society of Civil Engineers (ASCE). The accuracies of the <br /> markings are subject to the depth and electrical conductivity of the utility as well as site conditions and <br /> manhole access. Plastic and fiber optics lines without tracer wires may be unlocatable. This service does <br /> not include the use of ground penetrating radar and test pits. Exclusions: sanitary and storm laterals, roof <br /> drains, irrigation systems and abandoned lines. <br /> CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES <br /> 4 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.