Orange County NC Website
37 <br /> Slide #15 <br /> BOND STRATEGIES <br /> Orange Middle Schaal <br /> Funding <br /> • Renovation: focus on Educational Adequacy <br /> waolpert ��.� <br /> o Distributes funding districtwide,still with Option C: <br /> significant improvements at OMS <br /> Orange County $ 17•8 M <br /> • CTFIFC Upgrades schools: <br /> • ADA compliant hardware <br /> • HVAC upgrades to auditorium Issues to Consider <br /> • New kitchen freezers/coolers, backup generator <br /> • Enclose courtyard, decorative fencing Roou ri d e r warranty, D <br /> • Replace HVAC hoilers a HVAC life cycle,10 years <br /> • Replace courtyard canopy <br /> 9 Gym renovation • <br /> a Differing estimates&scope <br /> •' r ENGAGE. CHALLENGE. INSPIRE- <br /> Slide #16 <br /> BOND STRATEGIES <br /> Partnership Academy HS <br /> Funding <br /> * High Priority Needs & Educational Adequacy <br /> waolpert �•� � <br /> • New site location: moved from Storey Lane to Option C: <br /> Corporate Drive (Welcome Center Building 2) orange County <br /> • Kitchen/Cafeteria addition (school, CTE) schools: 1S•5 <br /> • Reroof 1C Building 1 <br /> • Life cycle mechanical <br /> • New fire alarm <br /> • Additional parking <br /> - of Partnership Academy <br /> Welcome • y <br /> • Repair/replace fencing changed significantly <br /> Increased overall square footage by—sq. fl. Woolpert study <br /> * Future of Building I still <br /> Added classroom, (gym) multipurpose and outdoor consideredstudents <br /> space, hallways, and spaces for student support <br /> Aft "Fully-functional school" <br /> ENGAGE. CHALLENGE. INSPIRE. <br /> Commissioner McKee asked how much square footage it creates. <br /> Dwayne Foster said 100,000 square feet. <br /> Commissioner Hamilton asked how many students are served and will be served by this <br /> change. <br />