Orange County NC Website
36 <br /> Slide#13 <br /> r r <br /> I�Rb1rQo[] L <br /> - °"W <br /> Dwayne Foster showed where traffic issues would occur on slide #13. <br /> Slide#14 <br /> PROJECTSCAPITAL <br /> Central Elementary <br /> Scope of ongoing work: <br /> • Current HVAC renovation <br /> • Recent roof replacement <br /> • Electrical upgrades (switchgear) <br /> • Lighting upgrades (LED conversion) <br /> • Partial ceiling replacement Issues to Consider <br /> • Boilers replaced <br /> • Controls upgrades (HVAC) *possibleversions <br /> our scho <br /> investment <br /> addresses <br /> Needs & Education <br /> Adequacy Issues at CES <br /> r ENGAGE. CHALLENGE. INSPIRE. <br /> Dwayne Foster said they identified $5 million from the bond to assist in the creation of <br /> creating the best possible schools. <br />